IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 32712 Clay Building Material and Refractories Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0467 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $182 $375 Implemented
SU0467 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,806 $10,588 Implemented
SU0467 # 06 Y:2018 06 2018 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $780 $1,340 Not Implemented
SU0467 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,794 $1,685 Not Implemented
SU0467 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,680 $1,169 Implemented
SU0467 # 01 Y:2018 01 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $86 $0 Implemented
SU0467 # 02 Y:2018 02 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,489 $99 Not Implemented
SU0467 # 03 Y:2018 03 2018 ELIMINATE/REDUCE AN OPERATION $6,396 $3,593 Implemented
LE0461 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,242 $2,000 Not Implemented
LE0461 # 06 Y:2018 06 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $34,308 $200,000 Not Implemented
LE0461 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,358 $92,947 Not Implemented
LE0461 # 04 Y:2018 04 2018 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $221,077 $850,000 Not Implemented
LE0461 # 03 Y:2018 03 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,854 $9,000 Not Implemented
LE0461 # 01 Y:2018 01 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,938 $500 Not Implemented
UA0196 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,926 $41,196 Not Implemented
UA0196 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $894 $550 Implemented
UA0196 # 03 Y:2018 03 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,166 $1,227 Implemented
UA0196 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,798 $1,165 Implemented
UA0196 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,660 $100 Not Implemented
UA0196 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,085 $3,000 Not Implemented
UA0196 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $7,511 $3,443 Implemented
UA0196 # 08 Y:2018 08 2018 BURN A LESS EXPENSIVE GRADE OF FUEL $1,051 $1,325 Not Implemented