IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

15

matching recommendations
Reset
NAICS 327212 Other Pressed and Blown Glass and Glassware Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0769 # 01 Y:2008 01 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $53,558 $2,347 Not Implemented
OK0769 # 02 Y:2008 02 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $18,368 $731 Not Implemented
OK0769 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $788 $1,922 Implemented
OK0769 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98,641 $246,228 Not Implemented
OK0769 # 05 Y:2008 05 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,911 $4,475 Implemented
OK0769 # 06 Y:2008 06 2008 $2,068 $200 Not Implemented
OK0769 # 07 Y:2008 07 2008 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $451,827 $2,500,000 Not Implemented
OK0711 # 01 Y:2005 01 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,068 $25,248 Not Implemented
OK0711 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $333 $647 Not Implemented
OK0711 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,907 $3,150 Not Implemented
OK0711 # 04 Y:2005 04 2005 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,929 $125 Not Implemented
OK0711 # 05 Y:2005 05 2005 $8,800 $0 Not Implemented
OK0711 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $846 $811 Not Implemented
OK0711 # 07 Y:2005 07 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $215,784 $8,400 Not Implemented
OK0711 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $603 $4,626 Not Implemented