IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
NAICS 3314 Nonferrous Metal (except Aluminum) Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0436 # 02 Y:2011 02 2011 OPTIMIZE PLANT POWER FACTOR $32,243 $22,700 Not Implemented
WV0436 # 01 Y:2011 01 2011 PREHEAT COMBUSTION AIR WITH WASTE HEAT $62,911 $74,268 Not Implemented
WV0436 # 11 Y:2011 11 2011 INSULATE BARE EQUIPMENT $335 $154 Implemented
WV0436 # 10 Y:2011 10 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,400 $1,000 Implemented
WV0436 # 09 Y:2011 09 2011 INSTALL TIMERS AND/OR THERMOSTATS $4,976 $5,400 Not Implemented
WV0436 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,227 $12,576 Implemented
WV0436 # 07 Y:2011 07 2011 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $7,082 $25,000 Not Implemented
WV0436 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,039 $1,920 Not Implemented
WV0436 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,983 $8,375 Not Implemented
WV0436 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,837 $45,545 Implemented
WV0436 # 03 Y:2011 03 2011 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $21,604 $29,900 Not Implemented
WV0288 # 14 Y:2004 14 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $95 $200 Implemented
WV0288 # 13 Y:2004 13 2004 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $203 $25 Implemented
WV0288 # 12 Y:2004 12 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $804 $1,100 Not Implemented
WV0288 # 11 Y:2004 11 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,876 $3,500 Not Implemented
WV0288 # 10 Y:2004 10 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,739 $575 Implemented
WV0288 # 09 Y:2004 09 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,932 $50 Implemented
WV0288 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,040 $3,210 Not Implemented
WV0288 # 07 Y:2004 07 2004 DEVELOP A REPAIR/REPLACE POLICY $4,573 $1,000 Implemented
WV0288 # 06 Y:2004 06 2004 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,772 $27,600 Implemented
WV0288 # 05 Y:2004 05 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $6,212 $1,200 Implemented
WV0288 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,061 $250 Not Implemented
WV0288 # 03 Y:2004 03 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,120 $700 Not Implemented
WV0288 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,141 $360 Implemented
WV0288 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,469 $2,195 Not Implemented