IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

425

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0239 # 03 Y:2025 03 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,251 $3,566 n/a
WM0239 # 04 Y:2025 04 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,613 $840 n/a
WM0239 # 01 Y:2025 01 2025 USE SYNTHETIC LUBRICANT $40,192 $23,257 n/a
WM0239 # 06 Y:2025 06 2025 INSTALL OCCUPANCY SENSORS $1,167 $2,240 n/a
WM0239 # 05 Y:2025 05 2025 INSTALL REPLACEMENT DOORS $2,866 $4,605 n/a
WM0239 # 02 Y:2025 02 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $30,028 $22,500 n/a
WM0230 # 02 Y:2025 02 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,743 $4,500 n/a
WM0230 # 03 Y:2025 03 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,667 $900 n/a
WM0230 # 04 Y:2025 04 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,358 $2,488 n/a
WM0230 # 01 Y:2025 01 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $155,302 $120,000 n/a
WM0229 # 02 Y:2025 02 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,336 $0 n/a
WM0229 # 01 Y:2025 01 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,865 $3,500 n/a
WM0229 # 03 Y:2025 03 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,880 $1,455 n/a
WM0229 # 05 Y:2025 05 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $476 $460 n/a
WM0229 # 04 Y:2025 04 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,572 $0 n/a
WM0229 # 06 Y:2025 06 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $267 $129 n/a
WM0214 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,590 $2,250 Implemented
WM0214 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,880 $1,500 Implemented
WM0214 # 01 Y:2024 01 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,388 $6,030 Not Implemented
WM0214 # 04 Y:2024 04 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,508 $0 Implemented
WM0210 # 09 Y:2024 09 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $277 $0 Not Implemented
WM0210 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $566 $1,050 Not Implemented
WM0210 # 02 Y:2024 02 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,116 $0 Not Implemented
WM0210 # 08 Y:2024 08 2024 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $564 $1,417 Not Implemented
WM0210 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $12,043 $21,250 Not Implemented