Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
38
matching recommendationsNAICS | 3323 | Architectural and Structural Metals Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1137 # 10 Y:2025 | 10 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,857 | $3,900 | n/a |
OK1137 # 09 Y:2025 | 09 | 2025 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,109 | $2,120 | n/a |
OK1137 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $641 | $985 | n/a |
OK1137 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $520 | $1,286 | n/a |
OK1137 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,249 | $160,056 | n/a |
OK1137 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,482 | $12,000 | n/a |
OK1137 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,886 | $1,320 | n/a |
OK1137 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,920 | $6,940 | n/a |
OK1137 # 07 Y:2025 | 07 | 2025 | COMBINE UTILITY METERS | $682 | $80 | n/a |
OK1137 # 08 Y:2025 | 08 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $558 | $410 | n/a |
UA0294 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $813 | $1,572 | n/a |
UA0294 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $2,012 | $2,261 | n/a |
UA0294 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $232 | $250 | n/a |
UA0294 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $916 | $1,133 | n/a |
UA0294 # 04 Y:2025 | 04 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $5,323 | $29 | n/a |
UA0294 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,922 | $377,678 | n/a |
UA0294 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $14,895 | $2,777 | n/a |
UU0266 # 02 Y:2025 | 02 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $8,217 | $13,000 | n/a |
UU0266 # 01 Y:2025 | 01 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $15,681 | $22,500 | n/a |
UU0266 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,500 | $38,200 | n/a |
UU0266 # 03 Y:2025 | 03 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $52,801 | $18,500 | n/a |
UU0266 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $633 | $543 | n/a |
UU0266 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,730 | $6,960 | n/a |
UU0266 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $8,550 | $22,000 | n/a |
TT0324 # 07 Y:2025 | 07 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $3,929 | $13,000 | n/a |