IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

113

matching recommendations
Reset
NAICS 3329 Other Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0145 # 02 Y:2019 02 2019 USE FOG NOZZLES / SPRAY RINSING INSTEAD OF IMMERSION RINSING $10,866 $8,300 Not Implemented
WM0145 # 05 Y:2019 05 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $3,800 $1,040 Not Implemented
WM0145 # 07 Y:2019 07 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,002 $3,768 Implemented
WM0145 # 04 Y:2019 04 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,925 $2,210 Not Implemented
WM0145 # 03 Y:2019 03 2019 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $7,173 $2,200 Not Implemented
WM0145 # 01 Y:2019 01 2019 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $29,234 $3,500 Not Implemented
WM0145 # 06 Y:2019 06 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,032 $771 Not Implemented
WM0145 # 08 Y:2019 08 2019 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,134 $0 Not Implemented
WM0144 # 10 Y:2019 10 2019 PAY UTILITY BILLS ON TIME $339 $0 Not Implemented
WM0144 # 06 Y:2019 06 2019 USE SYNTHETIC LUBRICANT $2,446 $5,600 Not Implemented
WM0144 # 09 Y:2019 09 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $931 $4,100 Not Implemented
WM0144 # 08 Y:2019 08 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,411 $2,720 Not Implemented
WM0144 # 01 Y:2019 01 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $28,876 $6,000 Not Implemented
WM0144 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,839 $37,265 Not Implemented
WM0144 # 02 Y:2019 02 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $18,063 $148,245 Not Implemented
WM0144 # 03 Y:2019 03 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $11,011 $0 Not Implemented
WM0144 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,365 $3,000 Not Implemented
WM0144 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,785 $2,000 Not Implemented
SF0548 # 07 Y:2019 07 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $39,924 $172,115 Implemented
SF0548 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,363 $300 Implemented
SF0548 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,047 $2,930 Implemented
SF0548 # 05 Y:2019 05 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,653 $1,103 Implemented
SF0548 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $473 $100 Implemented
SF0548 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,764 $0 Implemented
SF0548 # 02 Y:2019 02 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $193 $0 Implemented