IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,345

matching recommendations
Reset
NAICS 333 Machinery Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1601 # 11 Y:2016 11 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $309 $710 Not Implemented
UK1601 # 12 Y:2016 12 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $1,351 $0 Not Implemented
UK1601 # 13 Y:2016 13 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $192 $0 Not Implemented
LE0412 # 01 Y:2016 01 2016 PREHEAT COMBUSTION AIR WITH WASTE HEAT $13,984 $20,000 Not Implemented
LE0412 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,397 $8,050 Implemented
LE0412 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,688 $19,250 Implemented
LE0412 # 04 Y:2016 04 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $462 $1,382 Implemented
LE0412 # 05 Y:2016 05 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,944 $18,280 Not Implemented
LE0412 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,108 $4,125 Not Implemented
LE0412 # 07 Y:2016 07 2016 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $7,939 $35,720 Implemented
IP0058 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,007 $326 Not Implemented
IP0058 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $256 $51 Not Implemented
IP0058 # 03 Y:2016 03 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $30,281 $6,819 Not Implemented
IP0058 # 04 Y:2016 04 2016 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $11,137 $4,626 Not Implemented
IP0058 # 05 Y:2016 05 2016 USE MAGNETIC TECHNOLOGY TO TREAT WATER $227 $255 Not Implemented
IP0058 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $46,574 $102,745 Not Implemented
MZ0208 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $79 $200 Not Implemented
MZ0208 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,161 $6,600 Implemented
MZ0208 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $3,247 $1,250 Implemented
MZ0208 # 04 Y:2016 04 2016 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $118,110 $525,000 Implemented
MZ0202 # 01 Y:2016 01 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $19,101 $70,000 Not Implemented
MZ0202 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,180 $27,600 Not Implemented
MZ0202 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,654 $5,000 Not Implemented
MZ0202 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $3,839 $3,225 Not Implemented
MZ0202 # 05 Y:2016 05 2016 UPGRADE CONTROLS ON COMPRESSORS $9,678 $45,000 Not Implemented