Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 333242 | Semiconductor Machinery Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0561 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,203 | $110 | Not Implemented |
SF0561 # 03 Y:2020 | 03 | 2020 | INSULATE BARE EQUIPMENT | $3,116 | $1,412 | Implemented |
SF0561 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,435 | $3,959 | Not Implemented |
SF0561 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,548 | $4,226 | Implemented |
SF0561 # 06 Y:2020 | 06 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,263 | $18,437 | Not Implemented |
SF0561 # 07 Y:2020 | 07 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $35,550 | $236,909 | Implemented |
SF0561 # 01 Y:2020 | 01 | 2020 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,397 | $525 | Not Implemented |
WV0592 # 14 Y:2020 | 14 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $47 | $250 | Not Implemented |
WV0592 # 13 Y:2020 | 13 | 2020 | INSULATE BARE EQUIPMENT | $157 | $742 | Implemented |
WV0592 # 12 Y:2020 | 12 | 2020 | DEVELOP A REPAIR/REPLACE POLICY | $372 | $303 | Implemented |
WV0592 # 11 Y:2020 | 11 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $397 | $36 | Implemented |
WV0592 # 10 Y:2020 | 10 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $723 | $1,312 | Implemented |
WV0592 # 09 Y:2020 | 09 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $829 | $3,850 | Not Implemented |
WV0592 # 08 Y:2020 | 08 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $964 | $3,240 | Implemented |
WV0592 # 07 Y:2020 | 07 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $1,361 | $3,757 | Not Implemented |
WV0592 # 06 Y:2020 | 06 | 2020 | INSTALL SET-BACK TIMERS | $1,823 | $222 | Implemented |
WV0592 # 05 Y:2020 | 05 | 2020 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,832 | $4,720 | Not Implemented |
WV0592 # 04 Y:2020 | 04 | 2020 | MINIMIZE WATER USAGE | $3,145 | $2,100 | Implemented |
WV0592 # 03 Y:2020 | 03 | 2020 | INSTALL OCCUPANCY SENSORS | $4,217 | $9,054 | Implemented |
WV0592 # 02 Y:2020 | 02 | 2020 | RECYCLE WHITE WATER | $6,078 | $6,252 | Not Implemented |
WV0592 # 01 Y:2020 | 01 | 2020 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $8,201 | $9,500 | Implemented |