Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
958
matching recommendationsNAICS | 33341 | Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1115 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,084 | $2,944 | n/a |
OK1115 # 04 Y:2024 | 04 | 2024 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $7,273 | $11,595 | n/a |
IC0306 # 08 Y:2024 | 08 | 2024 | INSULATE BARE EQUIPMENT | $41,459 | $20,803 | n/a |
IC0306 # 07 Y:2024 | 07 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,874 | $10,418 | n/a |
IC0306 # 03 Y:2024 | 03 | 2024 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $2,629 | $118 | n/a |
IC0306 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,340 | $0 | n/a |
IC0306 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $158 | $432 | n/a |
IC0306 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,638 | $33,160 | n/a |
IC0306 # 02 Y:2024 | 02 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $22,099 | $10,776 | n/a |
IC0306 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $274,832 | $1,429,458 | n/a |
MI0442 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,876 | $16,028 | n/a |
MI0442 # 02 Y:2024 | 02 | 2024 | METER WASTE WATER | $13,483 | $956 | n/a |
MI0442 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $16,134 | $240 | n/a |
MI0442 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,002 | $70 | n/a |
MI0442 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,918 | $917 | n/a |
MI0442 # 04 Y:2024 | 04 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $9,720 | $159,280 | n/a |
GT0976 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $4,240 | $13,403 | n/a |
GT0976 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $273,272 | $5,081,734 | n/a |
GT0976 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $12,289 | $800 | n/a |
GT0976 # 03 Y:2024 | 03 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $375 | $200 | n/a |
GT0976 # 04 Y:2024 | 04 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $20,799 | $15,000 | n/a |
GT0976 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $20,852 | $2,185 | n/a |
GT0974 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $32,346 | $469,616 | Not Implemented |
GT0974 # 08 Y:2024 | 08 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,751 | $3,150 | Implemented |
GT0974 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,466 | $6,640 | Implemented |