Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
61
matching recommendationsNAICS | 33341 | Ventilation, Heating, Air-Conditioning, and Commercial Refrigeration Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0452 # 03 Y:2012 | 03 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $21,578 | $4,825 | Implemented |
WV0452 # 04 Y:2012 | 04 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $16,198 | $8,840 | Not Implemented |
WV0452 # 05 Y:2012 | 05 | 2012 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $14,172 | $1,000 | Implemented |
WV0452 # 10 Y:2012 | 10 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,515 | $2,117 | Not Implemented |
WV0452 # 06 Y:2012 | 06 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,772 | $54,225 | Not Implemented |
WV0452 # 15 Y:2012 | 15 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $431 | $1,505 | Not Implemented |
WV0452 # 13 Y:2012 | 13 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,098 | $1,105 | Implemented |
WV0452 # 11 Y:2012 | 11 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,487 | $10,561 | Not Implemented |
WV0452 # 16 Y:2012 | 16 | 2012 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $277 | $85 | Implemented |
WV0452 # 14 Y:2012 | 14 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $873 | $4,350 | Not Implemented |
WV0452 # 09 Y:2012 | 09 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,587 | $1,000 | Implemented |
WV0452 # 12 Y:2012 | 12 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,146 | $618 | Implemented |
WV0452 # 08 Y:2012 | 08 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $6,936 | $1,656 | Implemented |
WV0452 # 07 Y:2012 | 07 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,507 | $2,500 | Implemented |
NC0433 # 07 Y:2011 | 07 | 2011 | DEVELOP A REPAIR/REPLACE POLICY | $2,159 | $3,999 | Implemented |
NC0433 # 01 Y:2011 | 01 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $81,541 | $230,949 | Implemented |
NC0433 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,215 | $1,403 | Implemented |
NC0433 # 03 Y:2011 | 03 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,463 | $10,818 | Not Implemented |
NC0433 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,299 | $50 | Implemented |
NC0433 # 05 Y:2011 | 05 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,334 | $100 | Implemented |
NC0433 # 06 Y:2011 | 06 | 2011 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $17,685 | $29,025 | Not Implemented |
NC0433 # 08 Y:2011 | 08 | 2011 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $276 | $0 | Not Implemented |
NC0359 # 02 Y:2007 | 02 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $496 | $610 | Implemented |
NC0359 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,715 | $41,600 | Not Implemented |
NC0359 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,232 | $100 | Implemented |