IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

54

matching recommendations
Reset
NAICS 334118 Computer Terminal and Other Computer Peripheral Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0355 # 04 Y:2019 04 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $95,703 $480 Not Implemented
MI0355 # 08 Y:2019 08 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,503 $2,020 Not Implemented
MI0355 # 06 Y:2019 06 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,441 $72,870 Implemented
MI0355 # 09 Y:2019 09 2019 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $3,604 $2,070 Implemented
MI0355 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,941 $59,135 Implemented
MI0355 # 03 Y:2019 03 2019 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $91,845 $61,708 Not Implemented
MI0355 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $103,161 $14,000 Implemented
MI0355 # 01 Y:2019 01 2019 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $139,703 $245,760 Not Implemented
MI0355 # 07 Y:2019 07 2019 AIR CONDITION ONLY SPACE NECESSARY $13,642 $960 Not Implemented
BS0069 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $879 $503 Implemented
BS0069 # 06 Y:2015 06 2015 PAY UTILITY BILLS ON TIME $33 $0 Not Implemented
BS0069 # 05 Y:2015 05 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $198 $374 Implemented
BS0069 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $975 $1,145 Implemented
BS0069 # 02 Y:2015 02 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $159 $916 Not Implemented
BS0069 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $99 $576 Implemented
SU0393 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $3,091 $1,521 Implemented
SU0393 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,381 $775 Implemented
SU0393 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,698 $45,865 Implemented
SU0393 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $458 $394 Implemented
SU0393 # 06 Y:2015 06 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $478 $926 Implemented
SU0393 # 08 Y:2015 08 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $207 $488 Implemented
SU0393 # 07 Y:2015 07 2015 ELIMINATE/REDUCE AN OPERATION $2,246 $4,783 Not Implemented
SU0393 # 01 Y:2015 01 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,733 $0 Implemented
BS0047 # 05 Y:2015 05 2015 ADOPT IN-HOUSE MATERIAL GENERATION $38,230 $27,200 Not Implemented
BS0047 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $20,278 $200 Not Implemented