Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
61
matching recommendationsNAICS | 334118 | Computer Terminal and Other Computer Peripheral Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0584 # 07 Y:2024 | 07 | 2024 | INSTALL OCCUPANCY SENSORS | $1,782 | $666 | n/a |
AS0584 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $3,113 | $759 | n/a |
AS0584 # 01 Y:2024 | 01 | 2024 | INCREASE USE OF AUTOMATION | $73,061 | $428,000 | n/a |
AS0584 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,817 | $160,594 | n/a |
AS0584 # 03 Y:2024 | 03 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,657 | $8,115 | n/a |
AS0584 # 04 Y:2024 | 04 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,396 | $154 | n/a |
AS0584 # 05 Y:2024 | 05 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $5,118 | $1,273 | n/a |
MI0355 # 03 Y:2019 | 03 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $91,845 | $61,708 | Not Implemented |
MI0355 # 08 Y:2019 | 08 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,503 | $2,020 | Not Implemented |
MI0355 # 07 Y:2019 | 07 | 2019 | AIR CONDITION ONLY SPACE NECESSARY | $13,642 | $960 | Not Implemented |
MI0355 # 09 Y:2019 | 09 | 2019 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $3,604 | $2,070 | Implemented |
MI0355 # 05 Y:2019 | 05 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,941 | $59,135 | Implemented |
MI0355 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $103,161 | $14,000 | Implemented |
MI0355 # 06 Y:2019 | 06 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $20,441 | $72,870 | Implemented |
MI0355 # 01 Y:2019 | 01 | 2019 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $139,703 | $245,760 | Not Implemented |
MI0355 # 04 Y:2019 | 04 | 2019 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $95,703 | $480 | Not Implemented |
BS0069 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $99 | $576 | Implemented |
BS0069 # 02 Y:2015 | 02 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $159 | $916 | Not Implemented |
BS0069 # 03 Y:2015 | 03 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $879 | $503 | Implemented |
BS0069 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $975 | $1,145 | Implemented |
BS0069 # 05 Y:2015 | 05 | 2015 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $198 | $374 | Implemented |
BS0069 # 06 Y:2015 | 06 | 2015 | PAY UTILITY BILLS ON TIME | $33 | $0 | Not Implemented |
SU0393 # 08 Y:2015 | 08 | 2015 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $207 | $488 | Implemented |
SU0393 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $3,091 | $1,521 | Implemented |
SU0393 # 01 Y:2015 | 01 | 2015 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,733 | $0 | Implemented |