Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,581
matching recommendationsNAICS | 33441 | Semiconductor and Other Electronic Component Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0009 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $469 | $0 | Not Implemented |
SJ0009 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $8 | $200 | Implemented |
SJ0009 # 08 Y:2024 | 08 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $513 | $624 | Implemented |
SJ0009 # 09 Y:2024 | 09 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,761 | $2,675 | Not Implemented |
SJ0009 # 10 Y:2024 | 10 | 2024 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $147 | $50 | Implemented |
MU0036 # 01 Y:2023 | 01 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,852 | $0 | Not Implemented |
MU0036 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $388 | $0 | Implemented |
MU0036 # 03 Y:2023 | 03 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $10,129 | $49,885 | Implemented |
MU0036 # 04 Y:2023 | 04 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,737 | $0 | Implemented |
MU0036 # 05 Y:2023 | 05 | 2023 | USE PHOTOCELL CONTROLS | $756 | $0 | Implemented |
MU0036 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $1,296 | $30 | Not Implemented |
MU0036 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,370 | $0 | Implemented |
MU0036 # 08 Y:2023 | 08 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $305 | $1,240 | Not Implemented |
MU0036 # 09 Y:2023 | 09 | 2023 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $3,433 | $3,037 | Not Implemented |
MU0036 # 10 Y:2023 | 10 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $902 | $0 | Implemented |
MU0036 # 11 Y:2023 | 11 | 2023 | USE RADIANT HEATER FOR SPOT HEATING | $4,730 | $5,760 | Not Implemented |
MU0036 # 12 Y:2023 | 12 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,544 | $17,271 | Not Implemented |
MU0036 # 13 Y:2023 | 13 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $5,347 | $25,171 | Not Implemented |
OR0769 # 01 Y:2023 | 01 | 2023 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $3,018 | $7,000 | Not Implemented |
OR0769 # 02 Y:2023 | 02 | 2023 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $9,780 | $12,978 | Not Implemented |
OR0769 # 03 Y:2023 | 03 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,114 | $0 | Not Implemented |
SD0637 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $283 | $250 | Implemented |
SD0637 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $665 | $2,159 | Not Implemented |
SD0637 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,393 | $700 | Implemented |
SD0637 # 04 Y:2023 | 04 | 2023 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,593 | $8,642 | Not Implemented |