IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 334412 Bare Printed Circuit Board Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0298 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,018 $53,398 Implemented
MI0298 # 12 Y:2016 12 2016 INSTALL OCCUPANCY SENSORS $552 $177 Not Implemented
MI0298 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $664 $760 Not Implemented
MI0298 # 10 Y:2016 10 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,219 $40 Not Implemented
MI0298 # 09 Y:2016 09 2016 USE PHOTOCELL CONTROLS $2,087 $2,520 Not Implemented
MI0298 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,220 $1,660 Implemented
MI0298 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,991 $8,588 Not Implemented
MI0298 # 05 Y:2016 05 2016 RECOVER WASTE HEAT FROM EQUIPMENT $9,324 $3,985 Not Implemented
MI0298 # 04 Y:2016 04 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,528 $40 Not Implemented
MI0298 # 03 Y:2016 03 2016 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $16,796 $40,060 Not Implemented
MI0298 # 01 Y:2016 01 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $34,838 $36,314 Implemented
MI0298 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,682 $5,600 Not Implemented
UF0450 # 11 Y:2011 11 2011 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,406 $109 Not Implemented
UF0450 # 10 Y:2011 10 2011 AIR CONDITION ONLY SPACE NECESSARY $204 $17 Not Implemented
UF0450 # 09 Y:2011 09 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $1,074 $3,066 Not Implemented
UF0450 # 08 Y:2011 08 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $2,431 $0 Not Implemented
UF0450 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,013 $5,903 Not Implemented
UF0450 # 06 Y:2011 06 2011 USE COMPRESSOR AIR FILTERS $2,246 $270 Not Implemented
UF0450 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $24,031 $0 Not Implemented
UF0450 # 04 Y:2011 04 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,110 $0 Not Implemented
UF0450 # 03 Y:2011 03 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,667 $470 Not Implemented
UF0450 # 02 Y:2011 02 2011 INSTALL COMMON HEADER ON COMPRESSORS $1,378 $511 Not Implemented
UF0450 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,683 $0 Not Implemented