IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
NAICS 33451 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0367 # 08 Y:2013 08 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,499 $990 Not Implemented
LE0367 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,515 $500 Not Implemented
LE0367 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,165 $16,000 Not Implemented
LE0367 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,516 $1,350 Implemented
LE0367 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,606 $15,100 Not Implemented
LE0367 # 03 Y:2013 03 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,711 $0 Implemented
LE0367 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,213 $15,750 Implemented
LE0367 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,354 $9,800 Not Implemented
LE0234 # 05 Y:2006 05 2006 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $10,090 $6,000 Implemented
LE0234 # 08 Y:2006 08 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $593 $60 Implemented
LE0234 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,195 $3,490 Implemented
LE0234 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $5,320 $1,500 Implemented
LE0234 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $22,567 $1,250 Not Implemented
LE0234 # 03 Y:2006 03 2006 OPTIMIZE PLANT POWER FACTOR $21,102 $32,700 Not Implemented
LE0234 # 02 Y:2006 02 2006 REPAIR OR REPLACE STEAM TRAPS $46,545 $3,000 Implemented
LE0234 # 01 Y:2006 01 2006 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $190,924 $500,000 Implemented
LE0210 # 01 Y:2005 01 2005 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $5,350 $6,560 Not Implemented
LE0210 # 07 Y:2005 07 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $147 $360 Not Implemented
LE0210 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $255 $80 Implemented
LE0210 # 05 Y:2005 05 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $366 $140 Not Implemented
LE0210 # 04 Y:2005 04 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $2,330 $4,866 Implemented
LE0210 # 03 Y:2005 03 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,616 $2,000 Implemented
LE0210 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,088 $750 Implemented