IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
NAICS 33451 Navigational, Measuring, Electromedical, and Control Instruments Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0890 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,090 $1,000 Implemented
AM0890 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,660 $2,690 Implemented
AM0890 # 08 Y:2023 08 2023 INSTALL OCCUPANCY SENSORS $240 $480 Implemented
AM0890 # 01 Y:2023 01 2023 USE OPTIMUM TEMPERATURE $12,180 $0 Not Implemented
AM0890 # 06 Y:2023 06 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,790 $18 Implemented
AM0890 # 09 Y:2023 09 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $89 $38 Not Implemented
AM0890 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,310 $0 Not Implemented
AM0890 # 04 Y:2023 04 2023 PAY UTILITY BILLS ON TIME $2,933 $0 Not Implemented
AM0890 # 07 Y:2023 07 2023 USE SYNTHETIC LUBRICANT $350 $200 Not Implemented
OK0868 # 04 Y:2013 04 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,792 $1,851 Implemented
OK0868 # 13 Y:2013 13 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $33,598 $0 Implemented
OK0868 # 12 Y:2013 12 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,328 $7,958 Not Implemented
OK0868 # 11 Y:2013 11 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,457 $13,371 Implemented
OK0868 # 10 Y:2013 10 2013 INSTALL OCCUPANCY SENSORS $915 $4,669 Not Implemented
OK0868 # 09 Y:2013 09 2013 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $287 $456 Implemented
OK0868 # 08 Y:2013 08 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $5,338 $305 Not Implemented
OK0868 # 07 Y:2013 07 2013 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $7,022 $1,140 Implemented
OK0868 # 06 Y:2013 06 2013 INSTALL SET-BACK TIMERS $3,871 $606 Implemented
OK0868 # 05 Y:2013 05 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,424 $2,973 Not Implemented
OK0868 # 03 Y:2013 03 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,572 $7,700 Implemented
OK0868 # 02 Y:2013 02 2013 RECOVER WASTE HEAT FROM EQUIPMENT $19,626 $14,640 Not Implemented
OK0868 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,347 $750 Implemented
AM0637 # 09 Y:2013 09 2013 USE SYNTHETIC LUBRICANT $146 $0 Not Implemented
AM0637 # 01 Y:2013 01 2013 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $14,820 $400 Not Implemented
AM0637 # 03 Y:2013 03 2013 INSTALL SKYLIGHTS $4,110 $6,350 Not Implemented