IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

180

matching recommendations
Reset
NAICS 335313 Switchgear and Switchboard Apparatus Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0645 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,027 $20,044 Not Implemented
CC0020 # 03 Y:2023 03 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $2,402 $3,033 n/a
CC0020 # 04 Y:2023 04 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $31,379 $0 n/a
CC0020 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $54,767 $200,000 n/a
CC0020 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,812 $19,750 n/a
CC0020 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $23,819 $15,000 n/a
CC0020 # 08 Y:2023 08 2023 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $17,389 $200,000 n/a
CC0020 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,381 $0 n/a
CC0020 # 10 Y:2023 10 2023 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,194 $0 n/a
CC0020 # 11 Y:2023 11 2023 REPAIR OR REPLACE STEAM TRAPS $4,104 $6,050 n/a
CC0020 # 12 Y:2023 12 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $418 n/a
CC0020 # 02 Y:2023 02 2023 INSULATE FEEDWATER TANK $905 $1,622 n/a
CC0020 # 01 Y:2023 01 2023 PAY UTILITY BILLS ON TIME $4,526 $0 n/a
MZ0337 # 02 Y:2023 02 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,106 $2,400 Implemented
MZ0337 # 06 Y:2023 06 2023 IMPROVE SPACE COMFORT CONDITIONING $150,000 $75,650 Implemented
MZ0337 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,882 $6,873 Implemented
MZ0337 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $330 $820 Not Implemented
MZ0337 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,895 $9,731 Implemented
MZ0337 # 03 Y:2023 03 2023 USE PHOTOCELL CONTROLS $314 $100 Implemented
OR0756 # 03 Y:2022 03 2022 MODIFY CURRENT INCENTIVE PROGRAM $978 $0 Not Implemented
OR0756 # 04 Y:2022 04 2022 PURCHASE EQUIPMENT INSTEAD OF LEASING $38,280 $221,950 Not Implemented
OR0756 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,116 $120,000 Implemented
OR0756 # 01 Y:2022 01 2022 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $73,790 $0 Implemented
DL0207 # 10 Y:2022 10 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,800 $6,208 Implemented
DL0207 # 11 Y:2022 11 2022 INSULATE BARE EQUIPMENT $797 $2,124 Not Implemented