Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,427
matching recommendationsNAICS | 3363 | Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0064 # 15 Y:2025 | 15 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $137 | $0 | n/a |
MU0064 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,419 | $0 | n/a |
MU0064 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $39,818 | $496,424 | n/a |
MU0064 # 10 Y:2025 | 10 | 2025 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $2,331 | $1,688 | n/a |
MU0064 # 01 Y:2025 | 01 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $12,744 | $56,850 | n/a |
MU0064 # 16 Y:2025 | 16 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $2,121 | $1,483 | n/a |
MU0064 # 11 Y:2025 | 11 | 2025 | KEEP EQUIPMENT CLEAN | $1,393 | $0 | n/a |
MU0064 # 08 Y:2025 | 08 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $11,750 | $79,396 | n/a |
MU0064 # 09 Y:2025 | 09 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,961 | $35,691 | n/a |
TT0323 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT FOR HEAT | $26,365 | $221,500 | n/a |
TT0323 # 06 Y:2025 | 06 | 2025 | UTILIZE OUTSIDE CONTRACTING | $27,937 | $30,000 | n/a |
TT0323 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $315 | $180 | n/a |
TT0323 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,234 | $2,520 | n/a |
TT0323 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,028 | $400 | n/a |
TT0323 # 07 Y:2025 | 07 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $12,931 | $18,000 | n/a |
TT0323 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,604 | $2,430 | n/a |
TT0323 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $451 | $0 | n/a |
IP0204 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $31,597 | $20,000 | n/a |
IP0204 # 08 Y:2024 | 08 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,526 | $3,257 | n/a |
IP0204 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $6,381 | $4,247 | n/a |
IP0204 # 03 Y:2024 | 03 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $9,349 | $2,500 | n/a |
IP0204 # 05 Y:2024 | 05 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,853 | $5,575 | n/a |
IP0204 # 07 Y:2024 | 07 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,338 | $1,855 | n/a |
IP0204 # 01 Y:2024 | 01 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $114,962 | $0 | n/a |
IP0204 # 02 Y:2024 | 02 | 2024 | TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS | $83,128 | $16,790 | n/a |