Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,252
matching recommendationsNAICS | 33639 | Other Motor Vehicle Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2315 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,991 | $5,960 | Implemented |
KS2315 # 02 Y:2023 | 02 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $33,086 | $235,752 | Implemented |
KS2315 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,175 | $24,588 | Implemented |
KS2315 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $4,028 | $6,350 | Implemented |
KS2315 # 05 Y:2023 | 05 | 2023 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $545 | $1,958 | Not Implemented |
KS2315 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $39,181 | $254,691 | Not Implemented |
KS2315 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,874 | $421,464 | Not Implemented |
IP0167 # 10 Y:2022 | 10 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,565 | $8,140 | Implemented |
IP0167 # 09 Y:2022 | 09 | 2022 | OPTIMIZE PLANT POWER FACTOR | $11,341 | $26,639 | Implemented |
IP0167 # 08 Y:2022 | 08 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $10,286 | $21,879 | Not Implemented |
IP0167 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $369 | $730 | Not Implemented |
IP0167 # 06 Y:2022 | 06 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,236 | $2,330 | Not Implemented |
IP0167 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,306 | $3,300 | Not Implemented |
IP0167 # 04 Y:2022 | 04 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $6,333 | $2,520 | Implemented |
IP0167 # 03 Y:2022 | 03 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,573 | $475 | Implemented |
IP0167 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,801 | $3,457 | Implemented |
IP0167 # 01 Y:2022 | 01 | 2022 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $17,520 | $2,500 | Not Implemented |
UL2217 # 10 Y:2022 | 10 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $22,146 | $30,000 | Implemented |
UL2217 # 09 Y:2022 | 09 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $33,279 | $0 | Implemented |
UL2217 # 08 Y:2022 | 08 | 2022 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $6,524 | $25,900 | Not Implemented |
UL2217 # 07 Y:2022 | 07 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $6,919 | $102,018 | Not Implemented |
UL2217 # 06 Y:2022 | 06 | 2022 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,602 | $50,000 | Implemented |
UL2217 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,163 | $19,500 | Implemented |
UL2217 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $32,626 | $94,199 | Implemented |
UL2217 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,426 | $0 | Implemented |