Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
42
matching recommendationsNAICS | 3364 | Aerospace Product and Parts Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0240 # 08 Y:2024 | 08 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $49,476 | $225,000 | Implemented |
DL0240 # 07 Y:2024 | 07 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $691 | $14,290 | Not Implemented |
DL0240 # 06 Y:2024 | 06 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $5,688 | $26,100 | Not Implemented |
DL0240 # 05 Y:2024 | 05 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,202 | $14,500 | Implemented |
DL0240 # 04 Y:2024 | 04 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,194 | $3,716 | Implemented |
DL0240 # 01 Y:2024 | 01 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $12,775 | $0 | Implemented |
DL0240 # 02 Y:2024 | 02 | 2024 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $9,910 | $0 | Implemented |
DL0240 # 03 Y:2024 | 03 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $40,323 | $0 | Implemented |
DL0135 # 02 Y:2014 | 02 | 2014 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $19,800 | $1,450 | Implemented |
DL0135 # 05 Y:2014 | 05 | 2014 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $13,000 | $0 | Implemented |
DL0135 # 01 Y:2014 | 01 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $27,900 | $0 | Implemented |
DL0135 # 10 Y:2014 | 10 | 2014 | REDUCE VENTILATION AIR | $5,610 | $5,900 | Not Implemented |
DL0135 # 03 Y:2014 | 03 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,100 | $0 | Not Implemented |
DL0135 # 07 Y:2014 | 07 | 2014 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,400 | $0 | Implemented |
DL0135 # 09 Y:2014 | 09 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,170 | $270 | Not Implemented |
DL0135 # 04 Y:2014 | 04 | 2014 | REDUCE VENTILATION AIR | $22,400 | $0 | Not Implemented |
DL0135 # 06 Y:2014 | 06 | 2014 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $7,480 | $0 | Not Implemented |
DL0135 # 08 Y:2014 | 08 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,230 | $0 | Not Implemented |
DL0079 # 02 Y:2011 | 02 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,207 | $27,090 | Not Implemented |
DL0079 # 03 Y:2011 | 03 | 2011 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $12,737 | $100 | Implemented |
DL0079 # 04 Y:2011 | 04 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,364 | $1,015 | Implemented |
DL0079 # 05 Y:2011 | 05 | 2011 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,317 | $350 | Implemented |
DL0079 # 06 Y:2011 | 06 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,695 | $26,400 | Not Implemented |
DL0079 # 07 Y:2011 | 07 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,834 | $15,000 | Not Implemented |
DL0079 # 08 Y:2011 | 08 | 2011 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $464 | $105 | Implemented |