IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

736

matching recommendations
Reset
NAICS 33712 Household and Institutional Furniture Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0634 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $746 $120 Not Implemented
NC0634 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,566 $850 Implemented
NC0634 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $546 $2,500 Not Implemented
NC0634 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,879 $25,678 Implemented
AS0473 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,930 $5,282 Not Implemented
AS0473 # 03 Y:2019 03 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,599 $9,044 Implemented
AS0473 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $1,975 $2,120 Not Implemented
AS0473 # 05 Y:2019 05 2019 REDUCE HEAT GAIN BY WINDOW TINTING $727 $400 Not Implemented
AS0473 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $647 $2,803 Implemented
AS0473 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $699 $1,891 Implemented
AS0473 # 01 Y:2019 01 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,498 $1,790 Not Implemented
GT0923 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,479 $11,900 Not Implemented
GT0923 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,706 $21,021 Not Implemented
GT0923 # 03 Y:2019 03 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $33,904 $274,000 Not Implemented
GT0923 # 04 Y:2019 04 2019 RECOVER AND REUSE WASTE MATERIAL $31,200 $120,000 Not Implemented
NC0607 # 01 Y:2018 01 2018 INSTALL OCCUPANCY SENSORS $436 $797 Implemented
NC0607 # 02 Y:2018 02 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $805 $1,000 Implemented
NC0607 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $487 $200 Implemented
NC0607 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,655 $10,125 Implemented
NC0607 # 05 Y:2018 05 2018 RECOVER WASTE HEAT FROM EQUIPMENT $468 $1,500 Implemented
NC0607 # 06 Y:2018 06 2018 DEVELOP A REPAIR/REPLACE POLICY $1,097 $5,865 Implemented
UA0181 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,103 $88,547 Not Implemented
UA0181 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $5,103 $11,746 Implemented
UA0181 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,742 $500 Not Implemented
UA0181 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,999 $2,465 Implemented