IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
NAICS 33911 Medical Equipment and Supplies Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0074 # 07 Y:2022 07 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $432 $90 Not Implemented
NL0074 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $859 $1,225 Not Implemented
NL0074 # 05 Y:2022 05 2022 REDUCE VENTILATION AIR $1,627 $450 Not Implemented
NL0074 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,436 $19,905 Not Implemented
NL0074 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,687 $5,590 Not Implemented
NL0074 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $72,974 $20,000 Not Implemented
NL0074 # 01 Y:2022 01 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $214,263 $4,242 Not Implemented
NL0069 # 01 Y:2022 01 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $459,130 $2,266,822 Not Implemented
NL0069 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $100,270 $900 Not Implemented
NL0069 # 03 Y:2022 03 2022 UPGRADE CONTROLS ON COMPRESSORS $64,154 $20,000 Not Implemented
NL0069 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,908 $110,400 Not Implemented
NL0069 # 05 Y:2022 05 2022 RECOVER AND REUSE WASTE MATERIAL $10,312 $3,180 Not Implemented
NL0069 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,221 $1,069 Not Implemented
NL0069 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $599 $1,397 Not Implemented
NL0040 # 02 Y:2019 02 2019 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $38,925 $150,000 Not Implemented
NL0040 # 08 Y:2019 08 2019 RECYCLE WHITE WATER $2,649 $1,000 Implemented
NL0040 # 07 Y:2019 07 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,049 $18,439 Implemented
NL0040 # 06 Y:2019 06 2019 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $9,900 $3,660 Not Implemented
NL0040 # 05 Y:2019 05 2019 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $10,400 $51,350 Implemented
NL0040 # 04 Y:2019 04 2019 REPAIR OR REPLACE STEAM TRAPS $16,450 $4,500 Implemented
NL0040 # 03 Y:2019 03 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $25,402 $1,697 Implemented
NL0040 # 01 Y:2019 01 2019 OPTIMIZE PLANT POWER FACTOR $106,822 $130,000 Not Implemented
NL0008 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,345 $0 Implemented
NL0008 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $1,330 $14,200 Implemented
NL0008 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $457 $4,600 Implemented