Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,167
matching recommendationsNAICS | 33911 | Medical Equipment and Supplies Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0604 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,745 | $1,883 | n/a |
SF0604 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $21,457 | $280 | n/a |
SF0604 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $33,778 | $1,120 | n/a |
WV0646 # 07 Y:2023 | 07 | 2023 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,257 | $16,181 | Not Implemented |
WV0646 # 06 Y:2023 | 06 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $7,758 | $31,568 | Implemented |
WV0646 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $8,960 | $12,682 | Implemented |
WV0646 # 04 Y:2023 | 04 | 2023 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $9,785 | $48,224 | Not Implemented |
WV0646 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $35,692 | $89,814 | Not Implemented |
WV0646 # 02 Y:2023 | 02 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $37,824 | $112,795 | Not Implemented |
WV0646 # 01 Y:2023 | 01 | 2023 | MINIMIZE WATER USAGE | $150,340 | $110,597 | Not Implemented |
WV0646 # 08 Y:2023 | 08 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,490 | $301 | Implemented |
WV0646 # 09 Y:2023 | 09 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $3,094 | $1,481 | Implemented |
WV0646 # 10 Y:2023 | 10 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,040 | $9,723 | Not Implemented |
WV0646 # 11 Y:2023 | 11 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,436 | $1,807 | Implemented |
WV0646 # 12 Y:2023 | 12 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,904 | $1,500 | Implemented |
WV0646 # 13 Y:2023 | 13 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $669 | $1,895 | Implemented |
WV0646 # 14 Y:2023 | 14 | 2023 | INSTALL OCCUPANCY SENSORS | $644 | $1,312 | Implemented |
WV0646 # 15 Y:2023 | 15 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $419 | $909 | Implemented |
WV0646 # 16 Y:2023 | 16 | 2023 | INSULATE BARE EQUIPMENT | $357 | $407 | Implemented |
SD0638 # 03 Y:2023 | 03 | 2023 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $161 | $250 | Implemented |
SD0638 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,403 | $3,320 | Not Implemented |
SD0638 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,975 | $46,984 | Not Implemented |
SD0638 # 04 Y:2023 | 04 | 2023 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $59,928 | $104,792 | Not Implemented |
SD0638 # 14 Y:2023 | 14 | 2023 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $4,732 | $1,488 | Not Implemented |
SD0638 # 13 Y:2023 | 13 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $98,322 | $418,100 | Implemented |