IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

35

matching recommendations
Reset
NAICS 339112 Surgical and Medical Instrument Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0387 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $900 $2,690 Not Implemented
SD0387 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $445 $1,000 Not Implemented
SD0387 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,616 $3,786 Not Implemented
SD0387 # 02 Y:2006 02 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,871 $4,125 Not Implemented
SD0387 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $104,355 $91,000 Not Implemented
SF0331 # 07 Y:2006 07 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $885 $2,838 Not Implemented
SF0331 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $371 $888 Implemented
SF0331 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,535 $4,389 Implemented
SF0331 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,020 $2,819 Not Implemented
SF0331 # 03 Y:2006 03 2006 OPTIMIZE PLANT POWER FACTOR $3,422 $1,950 Not Implemented
SF0331 # 02 Y:2006 02 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $16,440 $3,828 Implemented
SF0331 # 01 Y:2006 01 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,466 $169 Implemented
CO0581 # 02 Y:2006 02 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $430 $430 Not Implemented
CO0581 # 01 Y:2006 01 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,180 $450 Implemented
CO0581 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,190 $14,660 Not Implemented
CO0581 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,710 $18,130 Not Implemented
CO0581 # 05 Y:2006 05 2006 USE SOLAR HEAT TO HEAT MAKE-UP AIR $4,140 $36,720 Not Implemented
CO0581 # 06 Y:2006 06 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $1,580 $18,370 Not Implemented
SD0377 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,618 $0 Not Implemented
SD0377 # 02 Y:2006 02 2006 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $2,845 $0 Not Implemented
SD0377 # 03 Y:2006 03 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,914 $0 Not Implemented
SD0377 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $1,461 $384 Not Implemented
SD0377 # 05 Y:2006 05 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,088 $594 Not Implemented
SD0377 # 06 Y:2006 06 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $968 $0 Not Implemented
SD0377 # 07 Y:2006 07 2006 USE PHOTOCELL CONTROLS $771 $2,320 Not Implemented