IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 445 Food and Beverage Stores
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0573 # 02 Y:2024 02 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $30,296 $280,927 Not Implemented
AS0573 # 03 Y:2024 03 2024 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $2,286 $26,500 Not Implemented
AS0573 # 04 Y:2024 04 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $219 $144 Not Implemented
AS0573 # 01 Y:2024 01 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $67,584 $135,000 Not Implemented
MS0403 # 05 Y:2022 05 2022 UPGRADE OBSOLETE EQUIPMENT $300 $3,768 Implemented
MS0403 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $881 $5,800 Not Implemented
MS0403 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $298 $324 Not Implemented
MS0403 # 02 Y:2022 02 2022 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $1,349 $105 Not Implemented
MS0403 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,116 $2,579 Implemented
SD0449 # 08 Y:2012 08 2012 OPTIMIZE PLANT POWER FACTOR $3,189 $5,775 Not Implemented
SD0449 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,186 $2,022 Implemented
SD0449 # 06 Y:2012 06 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $865 $1,500 Implemented
SD0449 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,629 $2,471 Not Implemented
SD0449 # 04 Y:2012 04 2012 REPAIR AND ELIMINATE STEAM LEAKS $4,456 $1,200 Implemented
SD0449 # 03 Y:2012 03 2012 REPAIR AND ELIMINATE STEAM LEAKS $1,042 $200 Implemented
SD0449 # 02 Y:2012 02 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,454 $100 Not Implemented
SD0449 # 01 Y:2012 01 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,392 $100 Implemented
SD0434 # 06 Y:2011 06 2011 INSTALL SKYLIGHTS $11,302 $26,616 Not Implemented
SD0434 # 05 Y:2011 05 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,400 $2,063 Implemented
SD0434 # 04 Y:2011 04 2011 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,279 $4,751 Not Implemented
SD0434 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,711 $500 Not Implemented
SD0434 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $7,897 $1,387 Implemented
SD0434 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $799 $100 Implemented
LL0319 # 03 Y:2009 03 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $997 $360 Implemented
LL0319 # 04 Y:2009 04 2009 REDUCE HEAT GAIN BY WINDOW TINTING $248 $520 Implemented