IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

163

matching recommendations
Reset
NAICS 541 Professional, Scientific, and Technical Services
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0204 # 02 Y:2022 02 2022 USE OPTIMUM TEMPERATURE $1,182 $0 Implemented
DL0204 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $491 $45 Implemented
DL0204 # 04 Y:2022 04 2022 DEVELOP A REPAIR/REPLACE POLICY $32,583 $1,300 Not Implemented
DL0204 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,599 $24,771 Not Implemented
DL0204 # 06 Y:2022 06 2022 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $8,754 $18,145 Not Implemented
DL0204 # 07 Y:2022 07 2022 ADJUST VENTS TO MINIMIZE ENERGY USE $836 $465 Implemented
MS0395 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $677 $540 Implemented
MS0395 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,723 $18,748 Implemented
MS0395 # 01 Y:2022 01 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,342 $210,000 Not Implemented
MS0395 # 04 Y:2022 04 2022 UPGRADE OBSOLETE EQUIPMENT $2,447 $15,480 Not Implemented
DL0202 # 04 Y:2021 04 2021 BURN WASTE OIL FOR HEAT $12,350 $5,000 Implemented
DL0202 # 05 Y:2021 05 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,058 $24,746 Not Implemented
DL0202 # 06 Y:2021 06 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $870 $0 Implemented
DL0202 # 07 Y:2021 07 2021 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $530 $1,035 Not Implemented
DL0202 # 08 Y:2021 08 2021 RECOVER WASTE HEAT FROM EQUIPMENT $20,900 $50,000 Not Implemented
DL0202 # 03 Y:2021 03 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,460 $1,000 Implemented
DL0202 # 02 Y:2021 02 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,593 $750 Implemented
DL0202 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,105 $0 Implemented
OR0723 # 02 Y:2019 02 2019 RECOVER WASTE HEAT FROM EQUIPMENT $21,541 $1,027 Not Implemented
OR0723 # 03 Y:2019 03 2019 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $5,360 $1,789 Implemented
OR0723 # 01 Y:2019 01 2019 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $488,033 $1,500,000 Implemented
WM0104 # 03 Y:2017 03 2017 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $14,165 $0 Implemented
WM0104 # 05 Y:2017 05 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $4,008 $0 Implemented
WM0104 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $15,927 $33,500 Not Implemented
WM0104 # 01 Y:2017 01 2017 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $64,540 $93,226 Not Implemented