Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163
matching recommendationsNAICS | 541 | Professional, Scientific, and Technical Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0204 # 02 Y:2022 | 02 | 2022 | USE OPTIMUM TEMPERATURE | $1,182 | $0 | Implemented |
DL0204 # 03 Y:2022 | 03 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $491 | $45 | Implemented |
DL0204 # 04 Y:2022 | 04 | 2022 | DEVELOP A REPAIR/REPLACE POLICY | $32,583 | $1,300 | Not Implemented |
DL0204 # 05 Y:2022 | 05 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,599 | $24,771 | Not Implemented |
DL0204 # 06 Y:2022 | 06 | 2022 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $8,754 | $18,145 | Not Implemented |
DL0204 # 07 Y:2022 | 07 | 2022 | ADJUST VENTS TO MINIMIZE ENERGY USE | $836 | $465 | Implemented |
MS0395 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $677 | $540 | Implemented |
MS0395 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,723 | $18,748 | Implemented |
MS0395 # 01 Y:2022 | 01 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,342 | $210,000 | Not Implemented |
MS0395 # 04 Y:2022 | 04 | 2022 | UPGRADE OBSOLETE EQUIPMENT | $2,447 | $15,480 | Not Implemented |
DL0202 # 04 Y:2021 | 04 | 2021 | BURN WASTE OIL FOR HEAT | $12,350 | $5,000 | Implemented |
DL0202 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $37,058 | $24,746 | Not Implemented |
DL0202 # 06 Y:2021 | 06 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $870 | $0 | Implemented |
DL0202 # 07 Y:2021 | 07 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $530 | $1,035 | Not Implemented |
DL0202 # 08 Y:2021 | 08 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $20,900 | $50,000 | Not Implemented |
DL0202 # 03 Y:2021 | 03 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,460 | $1,000 | Implemented |
DL0202 # 02 Y:2021 | 02 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,593 | $750 | Implemented |
DL0202 # 01 Y:2021 | 01 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,105 | $0 | Implemented |
OR0723 # 02 Y:2019 | 02 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,541 | $1,027 | Not Implemented |
OR0723 # 03 Y:2019 | 03 | 2019 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $5,360 | $1,789 | Implemented |
OR0723 # 01 Y:2019 | 01 | 2019 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $488,033 | $1,500,000 | Implemented |
WM0104 # 03 Y:2017 | 03 | 2017 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $14,165 | $0 | Implemented |
WM0104 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,008 | $0 | Implemented |
WM0104 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $15,927 | $33,500 | Not Implemented |
WM0104 # 01 Y:2017 | 01 | 2017 | STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS | $64,540 | $93,226 | Not Implemented |