Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsNAICS | 611 | Educational Services |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0922 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $43,580 | $884,520 | n/a |
AM0922 # 01 Y:2024 | 01 | 2024 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $1,132 | $1,000 | n/a |
AM0922 # 03 Y:2024 | 03 | 2024 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $5,297 | $100 | n/a |
AM0922 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $708 | $9,870 | n/a |
UU0253 # 05 Y:2024 | 05 | 2024 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $150 | $450 | n/a |
UU0253 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $717 | $2,200 | n/a |
UU0253 # 03 Y:2024 | 03 | 2024 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $22,211 | $18,400 | n/a |
UU0253 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,113 | $26,430 | n/a |
AM0920 # 01 Y:2024 | 01 | 2024 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $903 | $35,477 | n/a |
AM0920 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $20,630 | $460,200 | n/a |
AM0920 # 03 Y:2024 | 03 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $6,640 | $7,500 | n/a |
AM0920 # 04 Y:2024 | 04 | 2024 | REPAIR FAULTY LOUVERS AND DAMPERS | $4,125 | $9,000 | n/a |
AM0920 # 05 Y:2024 | 05 | 2024 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,403 | $1,000 | n/a |
UU0253 # 01 Y:2024 | 01 | 2024 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $26,630 | $43,200 | n/a |
AM0918 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $25,377 | $489,840 | n/a |
AM0918 # 05 Y:2024 | 05 | 2024 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,601 | $3,000 | n/a |
AM0918 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $2,244 | $1,215 | n/a |
AM0918 # 03 Y:2024 | 03 | 2024 | REPAIR FAULTY LOUVERS AND DAMPERS | $412 | $3,000 | n/a |
AM0918 # 01 Y:2024 | 01 | 2024 | REDUCE FLUID FLOW RATES | $1,310 | $3,000 | n/a |
AM0917 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $77 | $1,470 | n/a |
AM0917 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $362 | $3,000 | n/a |
AM0917 # 02 Y:2024 | 02 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $21,840 | $468,000 | n/a |
AM0917 # 03 Y:2024 | 03 | 2024 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $21 | $300 | n/a |
UU0245 # 01 Y:2024 | 01 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $13,514 | $18,000 | n/a |
UU0245 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,693 | $25,330 | n/a |