IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 711 Performing Arts, Spectator Sports, and Related Industries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1067 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $175 $1,800 n/a
UD1067 # 02 Y:2023 02 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $965 $6,400 n/a
UD1067 # 03 Y:2023 03 2023 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $377 $250 n/a
UD1067 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $11,940 $143,080 n/a
LS1223 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $14,390 $1,190 Implemented
LS1223 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $346 $100 Implemented
LS1223 # 04 Y:2023 04 2023 REDUCE HEAT GAIN BY WINDOW TINTING $2,512 $1,050 Not Implemented
LS1223 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,128 $17,331 Implemented
LS1223 # 01 Y:2023 01 2023 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $803 $0 Implemented
LS0223 # 02 Y:2023 02 2023 INSTALL TIMERS AND/OR THERMOSTATS $160 $50 Implemented
LS0223 # 05 Y:2023 05 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $200 $630 Not Implemented
LS0223 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,193 $2,990 Implemented
LS0223 # 03 Y:2023 03 2023 INSTALL OCCUPANCY SENSORS $39 $50 Implemented
LS0223 # 01 Y:2023 01 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $11,364 $1,800 Not Implemented
WV0582 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,656 $56,277 Implemented
WV0582 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,715 $35,838 Implemented
WV0582 # 03 Y:2019 03 2019 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $9,634 $40,000 Implemented
WV0582 # 04 Y:2019 04 2019 MINIMIZE WATER USAGE $4,552 $7,000 Not Implemented
WV0582 # 05 Y:2019 05 2019 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $432 $1,900 Implemented
WV0582 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $339 $0 Implemented
WV0582 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $121 $563 Implemented