Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 92114 | Executive and Legislative Offices, Combined |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ORC014 # 03 Y:2024 | 03 | 2024 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $2,420 | $12,690 | n/a |
ORC014 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $4,418 | $448 | n/a |
ORC014 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,533 | $131,106 | n/a |
ORC009 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $307 | $200 | Not Implemented |
ORC009 # 04 Y:2023 | 04 | 2023 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $83 | $400 | Not Implemented |
ORC009 # 03 Y:2023 | 03 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $178 | $500 | Not Implemented |
ORC009 # 02 Y:2023 | 02 | 2023 | REPLACE BOILER | $1,624 | $10,000 | Not Implemented |
ORC009 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $654 | $2,000 | Not Implemented |
ORC008 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,527 | $4,000 | Not Implemented |
ORC008 # 06 Y:2023 | 06 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,574 | $500 | Not Implemented |
ORC008 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $668 | $5,000 | Not Implemented |
ORC008 # 03 Y:2023 | 03 | 2023 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $959 | $1,500 | Not Implemented |
ORC008 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $474 | $100 | Not Implemented |
ORC008 # 01 Y:2023 | 01 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $2,876 | $500 | Not Implemented |
AS0524 # 01 Y:2022 | 01 | 2022 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $3,648 | $8,445 | Implemented |
AS0524 # 07 Y:2022 | 07 | 2022 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $151 | $149 | Implemented |
AS0524 # 06 Y:2022 | 06 | 2022 | INSTALL SPECTRAL REFLECTORS / DELAMP | $193 | $54 | Implemented |
AS0524 # 05 Y:2022 | 05 | 2022 | SHADE WINDOWS FROM SUMMER SUN | $1,064 | $5,010 | Implemented |
AS0524 # 04 Y:2022 | 04 | 2022 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $1,682 | $742 | Implemented |
AS0524 # 03 Y:2022 | 03 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,785 | $200 | Implemented |
AS0524 # 02 Y:2022 | 02 | 2022 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,878 | $2,400 | Implemented |