IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 018 Horticultural Specialties
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0568 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,401 $115,340 n/a
AS0568 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $822 $7,680 n/a
AS0568 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $84 $345 n/a
AS0568 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,858 $4,846 n/a
CO0743 # 04 Y:2022 04 2022 RECOVER AND REUSE WASTE MATERIAL $1,718 $4,820 n/a
CO0743 # 05 Y:2022 05 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,800 $26,000 n/a
CO0743 # 03 Y:2022 03 2022 INSTALL SPECTRAL REFLECTORS / DELAMP $2,506 $9,960 n/a
CO0743 # 02 Y:2022 02 2022 USE HEAT PUMP FOR SPACE CONDITIONING $9,304 $42,082 n/a
CO0743 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $9,876 $84,276 n/a
LS2203 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,505 $3,841 Implemented
LS2203 # 04 Y:2022 04 2022 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $40,432 $24,848 Not Implemented
LS2203 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $179 $76 Implemented
LS2203 # 02 Y:2022 02 2022 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $747 $300 Not Implemented
LS2203 # 01 Y:2022 01 2022 USE A DIFFERENT OR RECYCLED RAW MATERIAL $91,930 $8,070 Implemented
DL0120 # 01 Y:2014 01 2014 INSTALL OCCUPANCY SENSORS $62,900 $38,400 Not Implemented
DL0120 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,777 $116,160 Implemented
DL0120 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,734 $9,000 Implemented
DL0120 # 04 Y:2014 04 2014 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $176,850 $624,000 Not Implemented
DL0120 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $338,000 $400,000 Not Implemented
DL0120 # 06 Y:2014 06 2014 INSTALL AUTOMATIC STACK DAMPER $22,042 $16,000 Not Implemented
DL0120 # 07 Y:2014 07 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $44,085 $50,000 Not Implemented
DL0120 # 08 Y:2014 08 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $52,252 $500,000 Not Implemented
DL0120 # 09 Y:2014 09 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,260 $300 Implemented
DL0120 # 10 Y:2014 10 2014 REPAIR OR REPLACE STEAM TRAPS $1,770 $350 Implemented