IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

511

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0443 # 09 Y:2017 09 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $228 $610 Not Implemented
SU0443 # 10 Y:2017 10 2017 UPGRADE OBSOLETE EQUIPMENT $86 $243 Implemented
BS0097 # 01 Y:2017 01 2017 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,590 $2,959 Not Implemented
BS0097 # 02 Y:2017 02 2017 TREAT AND REUSE RINSE WATERS $870 $8,674 Not Implemented
BS0097 # 03 Y:2017 03 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $6,781 $127,800 Not Implemented
BS0097 # 04 Y:2017 04 2017 TREAT AND REUSE EQUIPMENT CLEANING SOLUTIONS $751 $5,250 Not Implemented
BS0097 # 05 Y:2017 05 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $319 $2,189 Not Implemented
BS0097 # 06 Y:2017 06 2017 ADOPT IN-HOUSE MATERIAL GENERATION $3,137 $60,000 Not Implemented
BS0097 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $236 $131 Not Implemented
BS0097 # 08 Y:2017 08 2017 INSTALL OCCUPANCY SENSORS $212 $277 Not Implemented
BS0097 # 09 Y:2017 09 2017 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $140 $160 Not Implemented
SF0502 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,509 $80 Implemented
SF0502 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $379,684 $84,889 Implemented
SF0502 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $10,648 $2,311 Implemented
SF0502 # 04 Y:2017 04 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $25,335 $7,208 Not Implemented
SF0502 # 05 Y:2017 05 2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $21,631 $14,971 Implemented
SF0502 # 06 Y:2017 06 2017 REDESIGN PROCESS $46,628 $18,660 Implemented
SF0502 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,288 $138,203 Implemented
SF0502 # 08 Y:2017 08 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $11,335 $14,290 Implemented
SF0502 # 09 Y:2017 09 2017 INSULATE FEEDWATER TANK $1,760 $3,244 Not Implemented
SF0502 # 10 Y:2017 10 2017 INSULATE BARE EQUIPMENT $13,080 $26,316 Not Implemented
SF0502 # 11 Y:2017 11 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,617 $187,946 Not Implemented
AM0732 # 01 Y:2017 01 2017 TREAT AND REUSE RINSE WATERS $19,732 $5,800 Implemented
AM0732 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,470 $6,750 Implemented
AM0732 # 03 Y:2017 03 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,610 $1,255 Not Implemented