IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

466

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0025 # 09 Y:1991 09 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,462 $712 Not Implemented
AS0025 # 10 Y:1991 10 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,049 $568 Not Implemented
AS0025 # 11 Y:1991 11 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,533 $1,000 Not Implemented
AS0025 # 12 Y:1991 12 1991 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $210,801 $780,000 Not Implemented
OR0115 # 01 Y:1991 01 1991 USE MINIMUM STEAM OPERATING PRESSURE $126 $0 Not Implemented
OR0115 # 02 Y:1991 02 1991 INCREASE AMOUNT OF CONDENSATE RETURNED $142 $175 Not Implemented
OR0115 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,297 $0 Not Implemented
OR0115 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $85 $284 Not Implemented
OR0115 # 05 Y:1991 05 1991 OPTIMIZE PLANT POWER FACTOR $506 $2,700 Not Implemented
AS0023 # 01 Y:1991 01 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,685 $1,000 Not Implemented
AS0023 # 02 Y:1991 02 1991 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $230,323 $780,000 Not Implemented
AS0023 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,633 $440 Not Implemented
AS0023 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,629 $2,688 Not Implemented
AS0023 # 05 Y:1991 05 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,762 $0 Not Implemented
AS0023 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,767 $14,294 Not Implemented
AS0023 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,589 $0 Not Implemented
AS0023 # 08 Y:1991 08 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,627 $1,200 Not Implemented
AS0023 # 09 Y:1991 09 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,165 $2,000 Not Implemented
AS0023 # 10 Y:1991 10 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,543 $2,000 Not Implemented
AS0023 # 11 Y:1991 11 1991 IMPROVE LUBRICATION PRACTICES $1,470 $5,122 Not Implemented
AS0023 # 12 Y:1991 12 1991 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,237 $6,400 Not Implemented
WI0115 # 01 Y:1991 01 1991 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $15,437 $0 Implemented
WI0115 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $2,500 $10,000 Implemented
WI0115 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $261 $188 Implemented
WI0115 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $587 $240 Implemented