IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

334

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0278 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,040 $600 Implemented
IC0278 # 03 Y:2023 03 2023 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $175,901 $710,922 Not Implemented
IC0278 # 02 Y:2023 02 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $5,879 $15,415 Not Implemented
IC0278 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $147,541 $1,271,712 Not Implemented
IP0172 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,584 $8,088 Not Implemented
IP0172 # 02 Y:2023 02 2023 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $512 $83 Not Implemented
IP0172 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,640 $132 Not Implemented
IP0172 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,315 $14,588 Not Implemented
IP0172 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,870 $1,313 Not Implemented
IP0166 # 01 Y:2022 01 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $12,766 $0 Not Implemented
IP0166 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $526 $33 Implemented
IP0166 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,433 $1,162 Implemented
IP0166 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,625 $3,274 Implemented
IP0166 # 10 Y:2022 10 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $279 $665 Implemented
IP0166 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $198 $416 Implemented
IP0166 # 08 Y:2022 08 2022 RECOVER WASTE HEAT FROM EQUIPMENT $704 $1,279 Not Implemented
IP0166 # 12 Y:2022 12 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $136 $665 Implemented
IP0166 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,623 $0 Implemented
IP0166 # 03 Y:2022 03 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $9,132 $0 Not Implemented
IP0166 # 11 Y:2022 11 2022 OPTIMIZE PLANT POWER FACTOR $11,046 $43,200 Implemented
IP0166 # 02 Y:2022 02 2022 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $4,102 $0 Not Implemented
IP0161 # 01 Y:2022 01 2022 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $94 $0 Implemented
IP0161 # 05 Y:2022 05 2022 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,440 $13,298 Not Implemented
IP0161 # 04 Y:2022 04 2022 USE RADIANT HEATER FOR SPOT HEATING $709 $1,601 Not Implemented
IP0161 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $262 $724 Implemented