Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
36
matching recommendationsSIC | 20 | Food and Kindred Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0285 # 11 Y:1989 | 11 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $39,539 | $50,000 | Implemented |
KU0285 # 09 Y:1989 | 09 | 1989 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $10,347 | $26,640 | Not Implemented |
KU0285 # 10 Y:1989 | 10 | 1989 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $26,087 | $60,000 | Not Implemented |
OK0294 # 03 Y:1989 | 03 | 1989 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $5,053 | $8,840 | Implemented |
OK0294 # 05 Y:1989 | 05 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $277 | $229 | Implemented |
OK0294 # 01 Y:1989 | 01 | 1989 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,730 | $818 | Implemented |
KU0285 # 08 Y:1989 | 08 | 1989 | RECOVER AND REUSE COOLING WATER | $16,548 | $2,500 | Implemented |
KU0285 # 01 Y:1989 | 01 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,382 | $1,500 | Implemented |
KU0285 # 02 Y:1989 | 02 | 1989 | REDESIGN PROCESS | $6,788 | $7,000 | Not Implemented |
OK0294 # 06 Y:1989 | 06 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,180 | $7,140 | Implemented |
KU0285 # 03 Y:1989 | 03 | 1989 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $1,165 | $2,000 | Not Implemented |
OK0294 # 02 Y:1989 | 02 | 1989 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $3,202 | $7,214 | Implemented |
KU0285 # 04 Y:1989 | 04 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,527 | $24,000 | Implemented |
KU0285 # 05 Y:1989 | 05 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $16,478 | $22,600 | Implemented |
OK0294 # 04 Y:1989 | 04 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $555 | $1,500 | Implemented |
KU0285 # 06 Y:1989 | 06 | 1989 | INSTALL AUTOMATIC STACK DAMPER | $3,601 | $7,600 | Implemented |
KU0285 # 07 Y:1989 | 07 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $906 | $2,500 | Implemented |
KU0279 # 04 Y:1989 | 04 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $730 | $0 | Implemented |
KU0279 # 03 Y:1989 | 03 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $774 | $550 | Implemented |
KU0279 # 02 Y:1989 | 02 | 1989 | REPAIR AND ELIMINATE STEAM LEAKS | $400 | $500 | Implemented |
KU0279 # 01 Y:1989 | 01 | 1989 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $13,158 | $32,000 | Implemented |
KU0278 # 08 Y:1989 | 08 | 1989 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $913 | $0 | Implemented |
KU0278 # 06 Y:1989 | 06 | 1989 | IMPROVE LUBRICATION PRACTICES | $802 | $0 | Not Implemented |
KU0278 # 05 Y:1989 | 05 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,914 | $6,334 | Implemented |
KU0278 # 03 Y:1989 | 03 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $472 | $600 | Implemented |