IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

345

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0234 # 02 Y:2025 02 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,917 $2,750 n/a
WM0234 # 03 Y:2025 03 2025 INSTALL OCCUPANCY SENSORS $5,023 $279 n/a
WM0234 # 01 Y:2025 01 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,369 $5,616 n/a
WM0234 # 06 Y:2025 06 2025 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,418 $0 n/a
WM0234 # 05 Y:2025 05 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,221 $0 n/a
WM0234 # 04 Y:2025 04 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,502 $10,895 n/a
WM0231 # 04 Y:2025 04 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,105 $0 n/a
WM0231 # 02 Y:2025 02 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,829 $10,000 n/a
WM0231 # 06 Y:2025 06 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $952 $900 n/a
WM0231 # 01 Y:2025 01 2025 REPAIR OR REPLACE STEAM TRAPS $5,826 $3,840 n/a
WM0231 # 03 Y:2025 03 2025 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,383 $1,500 n/a
WM0231 # 05 Y:2025 05 2025 REPLACE BOILER $1,068 $1,150 n/a
WM0228 # 03 Y:2025 03 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,531 $4,430 n/a
WM0228 # 02 Y:2025 02 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,628 $3,197 n/a
WM0228 # 01 Y:2025 01 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,416 $0 n/a
WM0228 # 04 Y:2025 04 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,292 $1,200 n/a
WM0203 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,320 $13,750 Implemented
WM0203 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,171 $17,500 Not Implemented
WM0203 # 01 Y:2023 01 2023 USE SYNTHETIC LUBRICANT $16,641 $45,000 Implemented
WM0203 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,100 $0 Implemented
WM0203 # 02 Y:2023 02 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $13,369 $10,160 Implemented
WM0203 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,070 $1,900 Not Implemented
WM0163 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,532 $3,750 Not Implemented
WM0163 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,276 $0 Not Implemented
WM0163 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,848 $2,571 Not Implemented