Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
131
matching recommendationsSIC | 201 | Meat Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0086 # 02 Y:2023 | 02 | 2023 | INSULATE BARE EQUIPMENT | $6,202 | $6,211 | Implemented |
NL0086 # 05 Y:2023 | 05 | 2023 | KEEP EQUIPMENT CLEAN | $350 | $450 | Not Implemented |
NL0086 # 03 Y:2023 | 03 | 2023 | METER WASTE WATER | $4,239 | $1,348 | Implemented |
NL0086 # 01 Y:2023 | 01 | 2023 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $48,136 | $100,000 | Not Implemented |
NL0086 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $573 | $510 | Not Implemented |
NL0075 # 01 Y:2022 | 01 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $13,412 | $7,500 | Implemented |
NL0075 # 05 Y:2022 | 05 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $635 | $575 | Not Implemented |
NL0075 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,087 | $1,652 | Implemented |
NL0075 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,755 | $28,900 | Not Implemented |
NL0075 # 04 Y:2022 | 04 | 2022 | INSULATE BARE EQUIPMENT | $980 | $404 | Implemented |
NL0071 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,447 | $4,500 | Implemented |
NL0071 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,879 | $30,410 | Implemented |
NL0071 # 04 Y:2022 | 04 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,139 | $8,000 | Not Implemented |
NL0071 # 07 Y:2022 | 07 | 2022 | INSULATE BARE EQUIPMENT | $407 | $2,521 | Implemented |
NL0071 # 05 Y:2022 | 05 | 2022 | INSULATE BARE EQUIPMENT | $2,400 | $9,724 | Implemented |
NL0071 # 02 Y:2022 | 02 | 2022 | MINIMIZE WATER USAGE | $106,955 | $72,150 | Implemented |
NL0071 # 01 Y:2022 | 01 | 2022 | REPLACE BOILER | $280,847 | $220,000 | Not Implemented |
NL0047 # 05 Y:2020 | 05 | 2020 | RECOVER AND REUSE WASTE MATERIAL | $925 | $5,160 | Not Implemented |
NL0047 # 01 Y:2020 | 01 | 2020 | MINIMIZE WATER USAGE | $75,018 | $1,383 | Not Implemented |
NL0047 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,600 | $6,024 | Implemented |
NL0047 # 07 Y:2020 | 07 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $301 | $1,148 | Implemented |
NL0047 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $643 | $1,700 | Implemented |
NL0047 # 02 Y:2020 | 02 | 2020 | METER WASTE WATER | $41,210 | $15,000 | Implemented |
NL0047 # 04 Y:2020 | 04 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,234 | $230 | Implemented |
NL0039 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,739 | $1,600 | Implemented |