IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

186

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0573 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,292 $4,273 Implemented
SF0573 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $718 $0 Implemented
SF0573 # 02 Y:2021 02 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $4,133 $0 Implemented
SF0573 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $56,800 $266,176 Implemented
SF0573 # 03 Y:2021 03 2021 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $514 $105 Implemented
SF0573 # 04 Y:2021 04 2021 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $1,654 $960 Not Implemented
SF0502 # 06 Y:2017 06 2017 REDESIGN PROCESS $46,628 $18,660 Implemented
SF0502 # 11 Y:2017 11 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,617 $187,946 Not Implemented
SF0502 # 10 Y:2017 10 2017 INSULATE BARE EQUIPMENT $13,080 $26,316 Not Implemented
SF0502 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,288 $138,203 Implemented
SF0502 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,509 $80 Implemented
SF0502 # 09 Y:2017 09 2017 INSULATE FEEDWATER TANK $1,760 $3,244 Not Implemented
SF0502 # 05 Y:2017 05 2017 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $21,631 $14,971 Implemented
SF0502 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $10,648 $2,311 Implemented
SF0502 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $379,684 $84,889 Implemented
SF0502 # 08 Y:2017 08 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $11,335 $14,290 Implemented
SF0502 # 04 Y:2017 04 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $25,335 $7,208 Not Implemented
SD0539 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,649 $9,540 Implemented
SD0539 # 04 Y:2017 04 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,984 $18,111 Implemented
SD0539 # 01 Y:2017 01 2017 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $289,101 $1,166,652 Not Implemented
SD0539 # 07 Y:2017 07 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $496 $1,765 Not Implemented
SD0539 # 02 Y:2017 02 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $8,037 $28,000 Not Implemented
SD0539 # 06 Y:2017 06 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,327 $1,500 Implemented
SD0539 # 08 Y:2017 08 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $276 $800 Not Implemented
SD0539 # 05 Y:2017 05 2017 REPAIR AND ELIMINATE STEAM LEAKS $4,167 $600 Implemented