IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
Reset
SIC 201 Meat Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0238 # 05 Y:2006 05 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $16,103 $2,500 Implemented
LE0238 # 04 Y:2006 04 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $124,858 $17,600 Not Implemented
LE0238 # 03 Y:2006 03 2006 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $335,810 $500 Implemented
LE0238 # 02 Y:2006 02 2006 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $902,617 $540,000 Not Implemented
LE0238 # 01 Y:2006 01 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $1,077,481 $2,403,050 Not Implemented
UF0384 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,087 $1,070 Not Implemented
UF0384 # 02 Y:2006 02 2006 INSTALL OCCUPANCY SENSORS $2,569 $2,053 Not Implemented
UF0384 # 09 Y:2006 09 2006 INCREASE EFFICIENCY OF TRUCKS $2,312 $0 Not Implemented
UF0384 # 08 Y:2006 08 2006 INSULATE BARE EQUIPMENT $25,292 $72,945 Not Implemented
UF0384 # 07 Y:2006 07 2006 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $2,857 $575 Not Implemented
UF0384 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $1,524 $408 Not Implemented
UF0384 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,822 $3,057 Not Implemented
UF0384 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,026 $0 Not Implemented
UF0384 # 03 Y:2006 03 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $117 $0 Not Implemented
LL0257 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,875 $810 Not Implemented
LL0257 # 05 Y:2006 05 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $10,380 $18,000 Not Implemented
LL0257 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $5,404 $5,120 Not Implemented
LL0257 # 07 Y:2006 07 2006 USE PHOTOCELL CONTROLS $2,433 $450 Not Implemented
LL0257 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $889 $700 Not Implemented
LL0257 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,389 $90 Not Implemented
LL0257 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $182 $420 Not Implemented
LL0257 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,217 $7,960 Not Implemented
LL0257 # 01 Y:2006 01 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $501,312 $98,000 Not Implemented
LL0257 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $302,971 $5,510 Not Implemented
LL0256 # 05 Y:2006 05 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,350 $720 Not Implemented