Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
20
matching recommendationsSIC | 2013 | Sausages And Other Prepared Meats |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LS1809 # 07 Y:2018 | 07 | 2018 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,145 | $11,000 | Not Implemented |
LS1809 # 06 Y:2018 | 06 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $33 | $50 | Not Implemented |
LS1809 # 05 Y:2018 | 05 | 2018 | INSULATE BARE EQUIPMENT | $364 | $440 | Not Implemented |
LS1809 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,902 | $4,019 | Not Implemented |
LS1809 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $401 | $300 | Not Implemented |
LS1809 # 02 Y:2018 | 02 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $134 | $45 | Not Implemented |
LS1809 # 01 Y:2018 | 01 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,090 | $100 | Not Implemented |
LL0303 # 04 Y:2008 | 04 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $764 | $660 | Implemented |
LL0303 # 06 Y:2008 | 06 | 2008 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $232 | $33 | Not Implemented |
LL0303 # 05 Y:2008 | 05 | 2008 | INSTALL OCCUPANCY SENSORS | $321 | $60 | Not Implemented |
LL0303 # 03 Y:2008 | 03 | 2008 | INSULATE BARE EQUIPMENT | $819 | $999 | Implemented |
LL0303 # 02 Y:2008 | 02 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $1,121 | $730 | Implemented |
LL0303 # 01 Y:2008 | 01 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,534 | $30 | Not Implemented |
LL0236 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,322 | $4,300 | Implemented |
LL0236 # 07 Y:2005 | 07 | 2005 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $25,780 | $0 | Not Implemented |
LL0236 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $295 | $100 | Implemented |
LL0236 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $688 | $300 | Implemented |
LL0236 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $772 | $0 | Not Implemented |
LL0236 # 03 Y:2005 | 03 | 2005 | INSULATE BARE EQUIPMENT | $3,312 | $500 | Implemented |
LL0236 # 02 Y:2005 | 02 | 2005 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $5,274 | $9,000 | Implemented |