Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

47

matching recommendations
Reset
SIC 2015 Poultry Slaughtering And Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2311 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,014 $39,200 Implemented
LS2311 # 04 Y:2023 04 2023 REPLACE BOILER $81,818 $210,000 Not Implemented
LS2311 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,096 $3,700 Implemented
LS2311 # 02 Y:2023 02 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,795 $560 Implemented
LS2311 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,616 $25 Implemented
LS0002 # 01 Y:2017 01 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,531 $0 Not Implemented
LS0002 # 04 Y:2017 04 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $16,140 $0 Not Implemented
LS0002 # 06 Y:2017 06 2017 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $8,736 $0 Not Implemented
LS0002 # 03 Y:2017 03 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $1,124 $0 Not Implemented
LS0002 # 05 Y:2017 05 2017 INSTALL FLOATING COVERS ON TANKS OF VOLATILE MATERIALS TO REDUCE EVAPORATION $271,330 $0 Not Implemented
LS0002 # 02 Y:2017 02 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $33,634 $0 Not Implemented
LL0257 # 05 Y:2006 05 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $10,380 $18,000 Not Implemented
LL0257 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $182 $420 Not Implemented
LL0257 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,389 $90 Not Implemented
LL0257 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $889 $700 Not Implemented
LL0257 # 07 Y:2006 07 2006 USE PHOTOCELL CONTROLS $2,433 $450 Not Implemented
LL0257 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $5,404 $5,120 Not Implemented
LL0257 # 01 Y:2006 01 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $501,312 $98,000 Not Implemented
LL0257 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $302,971 $5,510 Not Implemented
LL0257 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,875 $810 Not Implemented
LL0257 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,217 $7,960 Not Implemented
LL0256 # 07 Y:2006 07 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,368 $30 Not Implemented
LL0256 # 08 Y:2006 08 2006 INSTALL OCCUPANCY SENSORS $2,768 $210 Not Implemented
LL0256 # 09 Y:2006 09 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,347 $640 Implemented
LL0256 # 10 Y:2006 10 2006 USE PHOTOCELL CONTROLS $870 $90 Implemented