IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 202 Dairy Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0163 # 06 Y:2021 06 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,848 $2,571 Not Implemented
WM0163 # 01 Y:2021 01 2021 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,131 $40,000 Not Implemented
WM0163 # 07 Y:2021 07 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,532 $3,750 Not Implemented
WM0163 # 09 Y:2021 09 2021 INSTALL OCCUPANCY SENSORS $1,350 $930 Not Implemented
WM0163 # 08 Y:2021 08 2021 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,982 $4,125 Not Implemented
WM0163 # 03 Y:2021 03 2021 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,101 $3,100 Not Implemented
WM0163 # 04 Y:2021 04 2021 USE COMPRESSOR AIR FILTERS $3,566 $7,132 Not Implemented
WM0163 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,276 $0 Not Implemented
WM0163 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,431 $0 Not Implemented
DL0193 # 04 Y:2021 04 2021 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,467 $6,000 Not Implemented
DL0193 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,636 $35,000 Not Implemented
DL0193 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,526 $1,740 Not Implemented
DL0193 # 02 Y:2021 02 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,358 $3,540 Implemented
LE0506 # 04 Y:2021 04 2021 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $108,239 $800,000 Not Implemented
LE0506 # 03 Y:2021 03 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $36,412 $80,000 Not Implemented
LE0506 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,519 $5,000 Not Implemented
LE0506 # 01 Y:2021 01 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,556 $11,500 Not Implemented
DL0191 # 02 Y:2021 02 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,827 $0 Not Implemented
DL0191 # 04 Y:2021 04 2021 INSTALL / REPAIR INSULATION ON STEAM LINES $818 $168 Not Implemented
DL0191 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,696 $0 Not Implemented
DL0191 # 10 Y:2021 10 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,846 $1,500 Not Implemented
DL0191 # 09 Y:2021 09 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,391 $1,527 Not Implemented
DL0191 # 08 Y:2021 08 2021 INSTALL TIMERS AND/OR THERMOSTATS $687 $333 Not Implemented
DL0191 # 07 Y:2021 07 2021 RECOVER WASTE HEAT FROM EQUIPMENT $1,032 $4,500 Not Implemented
DL0191 # 06 Y:2021 06 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,208 $38 Not Implemented