IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
SIC 2023 Dry, Condensed, Evaporated Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0112 # 01 Y:2013 01 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,576 $14,260 Implemented
MZ0112 # 09 Y:2013 09 2013 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $61,800 $450,000 Not Implemented
MZ0112 # 08 Y:2013 08 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,303 $1,160 Not Implemented
MZ0112 # 07 Y:2013 07 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $27,737 $0 Not Implemented
MZ0112 # 06 Y:2013 06 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,024 $1,150 Not Implemented
MZ0112 # 05 Y:2013 05 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $48,000 $2,270 Implemented
MZ0112 # 04 Y:2013 04 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,415 $0 Implemented
MZ0112 # 03 Y:2013 03 2013 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $4,329 $0 Not Implemented
MZ0112 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $6,417 $3,000 Implemented
MO0227 # 01 Y:1998 01 1998 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $3,155 $3,700 Not Implemented
MO0227 # 09 Y:1998 09 1998 USE PLASTIC PALLETS INSTEAD OF WOOD $64,000 $31,500 Not Implemented
MO0227 # 08 Y:1998 08 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $388,472 $100,000 Not Implemented
MO0227 # 07 Y:1998 07 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $469 $0 Implemented
MO0227 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,138 $13,876 Implemented
MO0227 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,109 $139 Implemented
MO0227 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $164 $276 Implemented
MO0227 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,132 $6,768 Implemented
MO0227 # 02 Y:1998 02 1998 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $4,071 $9,000 Not Implemented