Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
512
matching recommendationsSIC | 2024 | Ice Cream And Frozen Desserts |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0224 # 01 Y:2006 | 01 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,943 | $0 | Implemented |
SU0224 # 02 Y:2006 | 02 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,147 | $0 | Implemented |
SU0224 # 03 Y:2006 | 03 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,039 | $0 | Implemented |
SU0224 # 04 Y:2006 | 04 | 2006 | USE SYNTHETIC LUBRICANT | $553 | $0 | Not Implemented |
SU0224 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,650 | $958 | Implemented |
SU0224 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,340 | $825 | Implemented |
SU0224 # 07 Y:2006 | 07 | 2006 | KEEP BOILER TUBES CLEAN | $2,726 | $1,466 | Implemented |
SU0224 # 08 Y:2006 | 08 | 2006 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $79,657 | $50,307 | Implemented |
SU0224 # 09 Y:2006 | 09 | 2006 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $43,464 | $52,154 | Implemented |
SU0224 # 10 Y:2006 | 10 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,736 | $14,580 | Implemented |
SU0224 # 11 Y:2006 | 11 | 2006 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $77 | $348 | Implemented |
SU0224 # 12 Y:2006 | 12 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,037 | $11,000 | Implemented |
SU0224 # 13 Y:2006 | 13 | 2006 | REDUCE VENTILATION AIR | $2,430 | $15,374 | Implemented |
UU0095 # 01 Y:2005 | 01 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,360 | $2,000 | Implemented |
UU0095 # 02 Y:2005 | 02 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,800 | $20,000 | Not Implemented |
UU0095 # 03 Y:2005 | 03 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $54,985 | $40,000 | Not Implemented |
UU0095 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $710 | $305 | Not Implemented |
UU0095 # 05 Y:2005 | 05 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,720 | $450 | Not Implemented |
UU0094 # 01 Y:2005 | 01 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,140 | $380 | Not Implemented |
UU0094 # 02 Y:2005 | 02 | 2005 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,260 | $7,000 | Not Implemented |
UU0094 # 03 Y:2005 | 03 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $370 | $220 | Not Implemented |
UU0094 # 04 Y:2005 | 04 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,540 | $0 | Not Implemented |
UU0094 # 05 Y:2005 | 05 | 2005 | USE OPTIMUM THICKNESS INSULATION | $110 | $150 | Not Implemented |
CO0559 # 01 Y:2004 | 01 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,070 | $440 | Implemented |
CO0559 # 02 Y:2004 | 02 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $355 | $416 | Implemented |