IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,930

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0201 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $2,084 $1,762 Not Implemented
MA0201 # 03 Y:1991 03 1991 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $159,131 $425,925 Not Implemented
MA0201 # 04 Y:1991 04 1991 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,784 $500 Not Implemented
OR0088 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,047 $500 Implemented
OR0088 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,353 $2,000 Implemented
OR0088 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $2,857 $3,790 Not Implemented
OR0088 # 04 Y:1990 04 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,340 $1,678 Not Implemented
OR0088 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $593 $952 Implemented
OR0088 # 06 Y:1990 06 1990 INSULATE FEEDWATER TANK $745 $1,198 Implemented
OR0088 # 07 Y:1990 07 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $344 $600 Not Implemented
OR0088 # 08 Y:1990 08 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $198 $392 Implemented
OR0088 # 09 Y:1990 09 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,302 $2,837 Not Implemented
OR0080 # 01 Y:1990 01 1990 REDUCE VENTILATION AIR $5,914 $0 Implemented
OR0080 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,416 $319 Not Implemented
OR0080 # 03 Y:1990 03 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,590 $1,500 Implemented
OR0080 # 04 Y:1990 04 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,957 $0 Implemented
OR0080 # 05 Y:1990 05 1990 INSTALL SET-BACK TIMERS $569 $660 Implemented
OR0080 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $559 $660 Not Implemented
OR0077 # 09 Y:1990 09 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $788 $2,117 Not Implemented
OR0077 # 01 Y:1990 01 1990 USE MINIMUM STEAM OPERATING PRESSURE $1,772 $0 Not Implemented
OR0077 # 02 Y:1990 02 1990 INSULATE FEEDWATER TANK $755 $297 Not Implemented
OR0077 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $658 $478 Not Implemented
OR0077 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,589 $0 Implemented
OR0077 # 05 Y:1990 05 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $191 $166 Not Implemented
OR0077 # 06 Y:1990 06 1990 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $3,471 $3,766 Not Implemented