IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,945

matching recommendations
Reset
SIC 203 Preserved Fruits And Vegetables
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0207 # 01 Y:1991 01 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $446 $197 Not Implemented
CO0207 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $2,050 $2,260 Not Implemented
CO0207 # 03 Y:1991 03 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $244 $724 Not Implemented
CO0207 # 04 Y:1991 04 1991 INSTALL TIMERS AND/OR THERMOSTATS $310 $450 Not Implemented
CO0207 # 05 Y:1991 05 1991 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $260 $590 Not Implemented
CO0207 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $260 $800 Not Implemented
MO0017 # 01 Y:1991 01 1991 RECOVER AND REUSE COOLING WATER $31,939 $0 Not Implemented
MO0017 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,734 $5,100 Not Implemented
MO0017 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $705 $1,087 Not Implemented
MO0017 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,750 $570 Not Implemented
MO0017 # 05 Y:1991 05 1991 MINIMIZE WATER USAGE $1,269 $0 Not Implemented
MO0017 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,117 $220 Not Implemented
MO0017 # 07 Y:1991 07 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $698 $1,195 Not Implemented
MO0017 # 08 Y:1991 08 1991 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $586 $40 Not Implemented
MA0201 # 01 Y:1991 01 1991 INSULATE BARE EQUIPMENT $2,084 $1,762 Not Implemented
MA0201 # 02 Y:1991 02 1991 INSULATE BARE EQUIPMENT $2,084 $1,762 Not Implemented
MA0201 # 03 Y:1991 03 1991 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $159,131 $425,925 Not Implemented
MA0201 # 04 Y:1991 04 1991 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,784 $500 Not Implemented
OR0088 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,047 $500 Implemented
OR0088 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,353 $2,000 Implemented
OR0088 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $2,857 $3,790 Not Implemented
OR0088 # 04 Y:1990 04 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,340 $1,678 Not Implemented
OR0088 # 05 Y:1990 05 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $593 $952 Implemented
OR0088 # 06 Y:1990 06 1990 INSULATE FEEDWATER TANK $745 $1,198 Implemented
OR0088 # 07 Y:1990 07 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $344 $600 Not Implemented