IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

422

matching recommendations
Reset
SIC 2038 Frozen Specialties, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0164 # 11 Y:1992 11 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,263 $3,500 Not Implemented
AM0141 # 01 Y:1992 01 1992 INCREASE AMOUNT OF CONDENSATE RETURNED $13,280 $6,775 Implemented
AM0141 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $7,250 $1,670 Implemented
AM0141 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,150 $11,940 Not Implemented
AM0141 # 04 Y:1992 04 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,970 $500 Implemented
AM0141 # 05 Y:1992 05 1992 INSTALL SET-BACK TIMERS $4,360 $200 Not Implemented
AM0141 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,370 $325 Implemented
AM0141 # 07 Y:1992 07 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,433 $3,150 Implemented
AM0141 # 08 Y:1992 08 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,820 $3,500 Not Implemented
AM0141 # 09 Y:1992 09 1992 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $730 $4,800 Implemented
AM0141 # 10 Y:1992 10 1992 INSTALL SET-BACK TIMERS $500 $400 Not Implemented
MO0017 # 01 Y:1991 01 1991 RECOVER AND REUSE COOLING WATER $31,939 $0 Not Implemented
MO0017 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,734 $5,100 Not Implemented
MO0017 # 03 Y:1991 03 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $705 $1,087 Not Implemented
MO0017 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,750 $570 Not Implemented
MO0017 # 05 Y:1991 05 1991 MINIMIZE WATER USAGE $1,269 $0 Not Implemented
MO0017 # 06 Y:1991 06 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,117 $220 Not Implemented
MO0017 # 07 Y:1991 07 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $698 $1,195 Not Implemented
MO0017 # 08 Y:1991 08 1991 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $586 $40 Not Implemented
OR0052 # 01 Y:1989 01 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $880 $0 Implemented
OR0052 # 02 Y:1989 02 1989 INSTALL SET-BACK TIMERS $2,541 $0 Implemented
OR0052 # 03 Y:1989 03 1989 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,550 $2,400 Implemented
OR0052 # 04 Y:1989 04 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $411 $320 Not Implemented
OR0052 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,363 $500 Implemented
OR0052 # 06 Y:1989 06 1989 INSULATE BARE EQUIPMENT $375 $385 Not Implemented