Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 2045 | Prepared Flour Mixes And Doughs |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0156 # 08 Y:2014 | 08 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,299 | $10,282 | Implemented |
MZ0156 # 07 Y:2014 | 07 | 2014 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $31,514 | $141,366 | Implemented |
MZ0156 # 06 Y:2014 | 06 | 2014 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $1,337 | $676 | Not Implemented |
MZ0156 # 05 Y:2014 | 05 | 2014 | USE OPTIMUM THICKNESS INSULATION | $9,068 | $30,128 | Implemented |
MZ0156 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,886 | $4,400 | Implemented |
MZ0156 # 03 Y:2014 | 03 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,460 | $400 | Implemented |
MZ0156 # 02 Y:2014 | 02 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,480 | $2,000 | Implemented |
MZ0156 # 01 Y:2014 | 01 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,514 | $71,320 | Implemented |
MZ0141 # 04 Y:2014 | 04 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,000 | $6,000 | Not Implemented |
MZ0141 # 08 Y:2014 | 08 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,940 | $0 | Implemented |
MZ0141 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $10,446 | $1,875 | Not Implemented |
MZ0141 # 06 Y:2014 | 06 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,518 | $21,850 | Implemented |
MZ0141 # 05 Y:2014 | 05 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $11,440 | $2,500 | Not Implemented |
AM0660 # 01 Y:2014 | 01 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,580 | $10,000 | Not Implemented |
MZ0141 # 03 Y:2014 | 03 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,254 | $11,500 | Not Implemented |
MZ0141 # 02 Y:2014 | 02 | 2014 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $12,947 | $24,000 | Not Implemented |
MZ0141 # 01 Y:2014 | 01 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,625 | $7,000 | Implemented |
AM0660 # 10 Y:2014 | 10 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $115 | $135 | Not Implemented |
AM0660 # 09 Y:2014 | 09 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $940 | $405 | Implemented |
AM0660 # 08 Y:2014 | 08 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $955 | $660 | Implemented |
AM0660 # 07 Y:2014 | 07 | 2014 | USE SYNTHETIC LUBRICANT | $1,080 | $0 | Implemented |
AM0660 # 06 Y:2014 | 06 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,260 | $0 | Not Implemented |
AM0660 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,560 | $855 | Implemented |
AM0660 # 04 Y:2014 | 04 | 2014 | INSTALL OCCUPANCY SENSORS | $1,560 | $2,425 | Not Implemented |
AM0660 # 03 Y:2014 | 03 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,765 | $10 | Implemented |