IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

305

matching recommendations
Reset
SIC 2047 Dog And Cat Food
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0549 # 15 Y:2017 15 2017 UPGRADE CONTROLS ON COMPRESSORS $527 $2,000 Implemented
WV0549 # 12 Y:2017 12 2017 MINIMIZE WATER USAGE $1,517 $1,050 Not Implemented
WV0549 # 13 Y:2017 13 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,249 $75 Implemented
WV0549 # 10 Y:2017 10 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,680 $500 Implemented
WV0549 # 01 Y:2017 01 2017 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $41,748 $105,000 Not Implemented
WV0549 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,263 $11,180 Implemented
WV0549 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,549 $0 Implemented
WV0549 # 03 Y:2017 03 2017 USE PHOTOCELL CONTROLS $4,781 $0 Implemented
WV0549 # 17 Y:2017 17 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $286 $1,075 Implemented
WV0549 # 09 Y:2017 09 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,755 $0 Implemented
WV0549 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $2,345 $6,890 Implemented
WV0549 # 08 Y:2017 08 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,180 $4,272 Not Implemented
WV0549 # 14 Y:2017 14 2017 DEVELOP A REPAIR/REPLACE POLICY $1,016 $582 Implemented
WV0549 # 06 Y:2017 06 2017 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $2,823 $11,000 Not Implemented
WV0549 # 16 Y:2017 16 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $308 $20 Implemented
WV0549 # 05 Y:2017 05 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,241 $1,000 Implemented
BD0481 # 03 Y:2016 03 2016 USE POWER DURING OFF-PEAK PERIODS $915 $100 Not Implemented
BD0481 # 01 Y:2016 01 2016 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $8,603 $10,500 Not Implemented
BD0481 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,932 $50 Not Implemented
BD0481 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $194 $425 Not Implemented
BD0481 # 06 Y:2016 06 2016 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $760 $1,040 Not Implemented
BD0481 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $764 $600 Implemented
BD0481 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $902 $3,944 Implemented
IA0539 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,398 $11,616 Implemented
IA0539 # 03 Y:2015 03 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,119 $3,351 Implemented