IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,839

matching recommendations
Reset
SIC 2051 Bread, Cake, And Related Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0136 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,212 $600 n/a
ME0136 # 02 Y:1994 02 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,058 $400 n/a
ME0136 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $600 $50 n/a
ME0136 # 04 Y:1994 04 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,772 $20 n/a
ME0136 # 05 Y:1994 05 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,959 $2,584 n/a
ME0136 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $520 $130 n/a
ME0136 # 07 Y:1994 07 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,300 $900 n/a
ME0136 # 08 Y:1994 08 1994 REPAIR OR REPLACE STEAM TRAPS $2,150 $300 n/a
IA0086 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,109 $456 Implemented
IA0086 # 02 Y:1994 02 1994 INSTALL OCCUPANCY SENSORS $770 $1,301 Implemented
IA0086 # 03 Y:1994 03 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $3,096 $0 Not Implemented
IA0086 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,360 $203 Implemented
IA0086 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $590 $25 Implemented
SF0023 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,476 $2,334 Implemented
SF0023 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,409 $2,795 Implemented
SF0023 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $2,616 $686 Not Implemented
SF0023 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $916 $420 Not Implemented
SF0023 # 05 Y:1994 05 1994 USE SYNTHETIC LUBRICANT $898 $0 Implemented
SF0023 # 06 Y:1994 06 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,157 $400 Implemented
SF0023 # 07 Y:1994 07 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,616 $2,050 Not Implemented
SF0023 # 08 Y:1994 08 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,337 $700 Not Implemented
AM0198 # 01 Y:1994 01 1994 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $18,000 $7,434 Implemented
AM0198 # 02 Y:1994 02 1994 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,820 $1,880 Not Implemented
AM0198 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $970 $2,200 Not Implemented
AM0198 # 04 Y:1994 04 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $520 $240 Implemented