Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
22
matching recommendationsSIC | 2051 | Bread, Cake, And Related Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0310 # 07 Y:2024 | 07 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $335 | $75 | n/a |
TT0310 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,799 | $60 | n/a |
TT0310 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $6,590 | $2,200 | n/a |
TT0310 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,227 | $9,500 | n/a |
TT0310 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,068 | $12,500 | n/a |
TT0310 # 02 Y:2024 | 02 | 2024 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $10,414 | $17,000 | n/a |
TT0310 # 01 Y:2024 | 01 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $25,939 | $3,600 | n/a |
LE0562 # 02 Y:2024 | 02 | 2024 | INSTALL OCCUPANCY SENSORS | $1,612 | $350 | Implemented |
LE0562 # 08 Y:2024 | 08 | 2024 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $13,989 | $60,600 | Not Implemented |
LE0562 # 07 Y:2024 | 07 | 2024 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,491 | $8,000 | Implemented |
LE0562 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,738 | $13,669 | Not Implemented |
LE0562 # 05 Y:2024 | 05 | 2024 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $727 | $1,000 | Implemented |
LE0562 # 04 Y:2024 | 04 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,836 | $5,000 | Not Implemented |
LE0562 # 03 Y:2024 | 03 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $27,865 | $27,000 | Not Implemented |
LE0562 # 01 Y:2024 | 01 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $4,513 | $320 | Implemented |
SF0612 # 01 Y:2024 | 01 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,332 | $226 | n/a |
SF0612 # 02 Y:2024 | 02 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $175 | $59 | n/a |
SF0612 # 03 Y:2024 | 03 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $73,026 | $18,461 | n/a |
SF0612 # 04 Y:2024 | 04 | 2024 | ISOLATE HOT OR COLD EQUIPMENT | $3,665 | $4,130 | n/a |
SF0612 # 05 Y:2024 | 05 | 2024 | USE OPTIMUM THICKNESS INSULATION | $106 | $151 | n/a |
SF0612 # 06 Y:2024 | 06 | 2024 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $21,923 | $54,880 | n/a |
SF0612 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,468 | $41,738 | n/a |