IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

502

matching recommendations
Reset
SIC 2064 Candy & Other Confectionery Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TR0049 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $13,577 $109,805 n/a
TR0049 # 04 Y:2023 04 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $3,612 $2,500 n/a
TR0049 # 01 Y:2023 01 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $82 $389 n/a
TR0049 # 03 Y:2023 03 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,525 $3,675 n/a
SJ0005 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,251 $4,556 Not Implemented
SJ0005 # 06 Y:2023 06 2023 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $5,992 $2,536 Implemented
SJ0005 # 02 Y:2023 02 2023 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $23,445 $5,613 Not Implemented
SJ0005 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,218 $962 Implemented
SJ0005 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $854 $658 Not Implemented
SJ0005 # 03 Y:2023 03 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $270 $0 Not Implemented
UU0217 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $2,013 $1,020 Implemented
UU0217 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,807 $8,910 Implemented
UU0217 # 01 Y:2023 01 2023 Install Anaerobic Digester $648,030 $7,400,000 Implemented
UU0217 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,794 $5,550 Not Implemented
UU0217 # 02 Y:2023 02 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,500 $51,330 Implemented
CM1010 # 05 Y:2022 05 2022 INCREASE EFFICIENCY OF TRUCKS $6,350 $48,100 n/a
CM1010 # 06 Y:2022 06 2022 IMPROVE HANDLING PRACTICES $1,056 $9,800 n/a
CM1010 # 07 Y:2022 07 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $14,400 $0 n/a
CM1010 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $54,241 $557,400 n/a
CM1010 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,190 $17,940 n/a
CM1010 # 03 Y:2022 03 2022 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $101,930 $41,000 n/a
CM1010 # 04 Y:2022 04 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $7,500 $12,400 n/a
LE0532 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,393 $5,160 Not Implemented
LE0532 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $33,992 $200,000 Not Implemented
LE0532 # 04 Y:2022 04 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $30,125 $80,000 Not Implemented