IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 207 Fats And Oils
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0353 # 05 Y:2010 05 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,266 $1,050 Not Implemented
MS0353 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,131 $322 Implemented
MS0353 # 03 Y:2010 03 2010 REPAIR AND ELIMINATE STEAM LEAKS $19,240 $312 Implemented
MS0353 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,831 $57,360 Implemented
MS0353 # 01 Y:2010 01 2010 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $1,522,531 $8,282,000 Not Implemented
MS0257 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $67,341 $2,000 Implemented
MS0257 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $535 $969 Not Implemented
MS0257 # 10 Y:2004 10 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $632 $1,029 Implemented
MS0257 # 09 Y:2004 09 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,231 $255 Not Implemented
MS0257 # 08 Y:2004 08 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,163 $742 Not Implemented
MS0257 # 07 Y:2004 07 2004 USE OPTIMUM THICKNESS INSULATION $3,906 $1,356 Not Implemented
MS0257 # 06 Y:2004 06 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,318 $2,673 Implemented
MS0257 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,325 $348 Implemented
MS0257 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,889 $17,026 n/a
MS0257 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $36,924 $54 Implemented
MS0257 # 01 Y:2004 01 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $71,237 $88,344 Not Implemented
MS0089 # 01 Y:1997 01 1997 OPTIMIZE PLANT POWER FACTOR $6,352 $9,450 n/a
MS0089 # 02 Y:1997 02 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $22,136 $49,751 n/a
MS0089 # 03 Y:1997 03 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $39,339 $58,400 n/a
MS0089 # 04 Y:1997 04 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,921 $1,000 n/a
MS0089 # 05 Y:1997 05 1997 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $480 $0 n/a
MS0089 # 06 Y:1997 06 1997 ELIMINATE SHIFT $139,776 $0 n/a